ABSTRACT

Based on the construction example of the bearing platform and pier abutment of a super large Expressway Bridge in Shanxi Province in winter, the temperature control measures for the reinforcement engineering and concrete mixing, transportation, pouring, curing, formwork removal and other links are formulated on the basis of thermal calculation, which can be used for reference for the quality control of concrete construction in winter.