ABSTRACT

To control the post-work settlement of the thick rock-filled gravel foundation of Wudangshan Airport to a reasonable level. In this paper, numerical simulation was used to investigate the law of post-work settlement under the conditions of maximum height of gravel layer and maximum filling height, respectively, to determine the required treatment depth. And then, based on analyzing the characteristics of existing means of deep foundation treatment, disposal suggestions for foundation treatment design were provided.