ABSTRACT

Since 2008, after signing the peace agreements in 2002, Angola has been carrying out several dam constructions and rehabilitation projects, with the aim of developing the country’s economy and serving its population better, in agricultural irrigation, potable water supply and power generation. Most Angolan dams were affected, directly or indirectly, during the armed conflict that took place for about 30 years. Some suffered from sabotage actions, or from the absence of adequate maintenance and/or rehabilitation actions for long periods. Further, in the case of the Matala dam, the concrete has developed alkalis reactions that boosted concrete degradation.

RÉSUMÉ: Depuis 2008, après la signature des accords de paix en 2002, l’Angola a mené à bien plusieurs projets de construction et de réhabilitation de barrages dans le but de développer l’économie du pays et de mieux servir sa population, dans les domaines de l’irrigation agricole, de l’approvisionnement en eau potable et de la sécurité alimentaire, ainsi que la production d’électricité. La plupart des barrages angolais ont été touchés, directement ou indirectement, par le conflit armé qui a duré environ 30 ans. Certains ont souffert d’actions de sabotage ou du manque d’entretien et/ou de réhabilitation adéquates pendant longues périodes. Pour ce qui concerne le cas particulier du barrage de Matala, le béton a développé des réactions alcali-agrégats qui ont accéléré la dégradation du béton.