ABSTRACT

The fourth series closed-circuit grinding system of the Meishan iron ore concentrator was made up of two sets of a 2.7 × 3.6 m ball mill and a 1.6 m double helix grading unit. The mill speed was 21.7  r/min, filling rate was 38%, and grinding concentration was above 88%.