ABSTRACT

ABSTRACT The aim of the investigation was the analysis of the integrity of a concrete road bridge structure crossing the Elbe river and having been operated since 1924. In accordance to a baseline investigation from 2015 in depth dynamic measurements were conducted in 2017 with regard to the remaining loading capacity based on a dense grid of accelerometer data and additional displacement measurements.