ABSTRACT

Groundwater may cause collapse of tunnels as well as ground subsidence during tunneling. Generally, analytical solution used for estimating the groundwater inflow rate does not consider groundwater level drawdown and can overestimate the inflow rate during design phase. In this study, parametric analysis was performed to investigate the effect of groundwater level drawdown.