Skip to main content
Taylor & Francis Group Logo
    Advanced Search

    Click here to search products using title name,author name and keywords.

    • Login
    • Hi, User  
      • Your Account
      • Logout
      Advanced Search

      Click here to search products using title name,author name and keywords.

      Breadcrumbs Section. Click here to navigate to respective pages.

      Chapter

      Variability of total sediment supply of the Chao Phraya River, Thailand
      loading

      Chapter

      Variability of total sediment supply of the Chao Phraya River, Thailand

      DOI link for Variability of total sediment supply of the Chao Phraya River, Thailand

      Variability of total sediment supply of the Chao Phraya River, Thailand book

      Variability of total sediment supply of the Chao Phraya River, Thailand

      DOI link for Variability of total sediment supply of the Chao Phraya River, Thailand

      Variability of total sediment supply of the Chao Phraya River, Thailand book

      ByB. Bidorn, S.A. Kish, J.F. Donoghue, W. Huang, K. Bidorn
      BookRiver Sedimentation

      Click here to navigate to parent product.

      Edition 1st Edition
      First Published 2016
      Imprint CRC Press
      Pages 8
      eBook ISBN 9781315623207
      Share
      Share

      ABSTRACT

      The sediment transport characteristics and historical trends of total sediment supply of the Chao Phraya River, which is the major sediment supply source to the Upper Gulf of Thailand, has been evaluated based on hydrographic surveys of the Chao Phraya River during the period 2012–2013. Detailed analyses of river characteristics conducted in this study combined with historical data indicate that suspended transport rates at the Chao Phraya River have a strong correlation with river discharge, and the relationship can be represented by a power equation with a coefficient of determination of 0.80. It also appears that this bed-to suspended load ratio varied in a narrow range between 0 and 0.05. A time series evaluation of total sediment load over 58-years period indicates that a significant reduction in the total sediment yield of the CPY River occurred after 1995, and it may cause by water management in the CPY River basin but significantly post-dates of the construction of large dams in this basin.

      T&F logoTaylor & Francis Group logo
      • Policies
        • Privacy Policy
        • Terms & Conditions
        • Cookie Policy
        • Privacy Policy
        • Terms & Conditions
        • Cookie Policy
      • Journals
        • Taylor & Francis Online
        • CogentOA
        • Taylor & Francis Online
        • CogentOA
      • Corporate
        • Taylor & Francis Group
        • Taylor & Francis Group
        • Taylor & Francis Group
        • Taylor & Francis Group
      • Help & Contact
        • Students/Researchers
        • Librarians/Institutions
        • Students/Researchers
        • Librarians/Institutions
      • Connect with us

      Connect with us

      Registered in England & Wales No. 3099067
      5 Howick Place | London | SW1P 1WG © 2022 Informa UK Limited