ABSTRACT

In order to minimize vertical movement between the roadway layer works and structure, the jockey slab is also tied down onto rock with vertical rock bolts.

The construction proceeded largely as planned and unforeseen delays that were experienced during construction mainly related to the piling process which proceeded substantially slower than anticipated.