ABSTRACT

Example 7. 11 The loading period for a new building extended from May 1995 to May 1997. In May 2000, the average measured settlement was found to be 11.43 cm. It is known that the ultimate settlement will be about 35.56 cm. Estimate the settlement in May 2005. Assume double drainage to occur.