ABSTRACT

The first category concerns methods to prevent the formation of cracks during the initial construction phase of the road or to treat existing cracks by choosing road structures, techniques and/or materials which induce less severe or no cracking or make existing or unavoidable cracks less active. An overview of these methods are given in 3.2. They are described in more detail in [ref. 1].