ABSTRACT

The Botlek Rail Tunnel was the second bored tunnel in The Netherlands and the first that was completed using an EPB shield. A considerable part of the tunnel was bored through Pleistocene sand under a high water table, see Figure 1. The water table was up to 23 m above the tunnel axis. Foam was used to stabilize the tunnel face.