ABSTRACT

Altogether ten boreholes with the sum length of 680 m were drilled which deepest borehole with the length of 90 m was drilled in the left abutment. General permeability conditions of rocks shows the higher value in the left abutment in comparison with the right abutment and foundation of the dam. R.Q.D values in the abutments are higher than the foundation.