ABSTRACT

Engineers and contractors have been designing and installing pile foundations for many years. The most common way of installing a pile is driving of it by a hammer especially in marine environments.A hammer which is too small may not be able to drive the pile to the required capacity; or may need an excessive number of blows. On the other hand, a hammer which is too large may damage the pile or fails to operate properly after a few blows.