ABSTRACT

The paper reviews the evolution of design practices in underground works relating to hydropower projects during the last decades, with the apparition of ever more powerful computation means and the elaboration of sophisticated modelling software. The benefits and drawbacks of the different practices are analysed, and conclusions are drawn on the best practice on modelling.