ABSTRACT

Installing and preloading a jack-up in stratified deposits, where a strong layer overlays weaker soil, remains a challenge for the offshore industry, with the potential for severe ‘punch-through’ failure under the load-controlled conditions. Uncontrolled rapid leg penetration may lead to buckling of the leg, effectively decommissioning the platform, or may even result in toppling of the unit.