ABSTRACT

Each construction modification was accompanied by batch test experiments used to check the physicochemical properties of the sludge water at different disintegration times (0-1280 seconds), which are proportionally related to energy inputs per sludge volume – Ev (kJ l−1). All tests started within 1 h after sampling to prevent subsequent sludge changes. The schematic diagram of the experimental set-up is shown in Figure 1.