ABSTRACT

For the raft foundation construction it was necessary to excavate the area down to −5.0 ÷ −8.0 m elevation. The excavation depth, measured from the ground level, is in the range of 8.3 ÷ 12.0 m.

Temporary support of the soil was achieved by multilevel anchored diaphragm walls.