ABSTRACT

The relation between ρ and A(ρ) is used to determine the quality control acceptance and non acceptance range as shown in Fig (1), for ACI, BS and a proposal Libyan criteria (PLC). Each criteria has a specified parameter “λ” such that:

ρ × ρ(A) ≤ λ% (3) Overall, the evaluation by this method gives

about 44% of the projects are being accepted.