ABSTRACT

The drill design and placement of the cut is dependant on many factors and a compromise will be made in relation to these. Normal short term usage development will require a different design to rapid capital development. Ore/waste separation tunnelling will require different design to decline development on a 30 m radius of curvature. The drill design should always take into account the explosive types being used.