ABSTRACT

ABSTRACT: There are many flood-water management constructions operating already in the Meuse river basin and more are planned in the next decades. Herein lie some big challenges. How to design new water management structures that are able to deal comprehensively with flooding, drought and increasing water demand. How to adapt existing flood control measures to cope with ever more extreme events. Through AMICE, new approaches to these challenges have been tested by three highly innovative projects in Germany, Flanders and the Netherlands.