ABSTRACT

The methods of mathematic modeling of deposits and mining system parameters are described in studies of K.E. Vinnitsky, N.B. Tabakman, E.I. Reyentovich, D.G. Bukeikhanov and etc. In this studies modeling methods classification and model creation methods by dynamic programming is proposed. Stripping works schedule studies allowed to develop the theory of the gradual pit development (V.V. Rzhevsky, V.S. Hohryakov, A.N. Shilin, B.P. Yumatov and etc.). Also huge excavator-truck complexes technologies and stripping method impacts on final pit are studied (Kuleshov 1980, Yakovlev 1989; Stolyarov 2009, Drizhenko 2011). However existing methods of determining the pit boundaries doesn`t consider such an important factor as stripping scheme constructed in last stages of pit development, which substantially corrects overburden volumes towards their increase in final stages (Shpansky 1998).