ABSTRACT

After the closure of the full bridge, prestressed tensioning is carried out, and then bridge deck pavement is constructed, thus forming a bridge. The finished state of the bridge is the initial state of the bridge structure. In order to make clear the influence of pier leaning on the finished continuous rigid frame bridge, the paper analyzes the influence of pier leaning on pier No. 2 as well as the internal force, stress and displacement of the bridge’s girder.