ABSTRACT

There exist clear requirements on size error of the components of a bridge in construction process. According to the technical specification for construction of highway bridge (JTG TF50-2011)[5], the allowed error of section size in height is +5 mm or −10 mm. The author found that, in many construction processes of long span continuous rigid frame bridges, size error existing in bridge girder cross section height exceeds the limits in the specification.