ABSTRACT

This paper focus on the damage prediction for the optimal inspection schedule plan.The probabilistic model for a describing temporal variation of the damage accumulation is employed to estimate the future state of the tunnel lining concrete. Then, the preventive maintenance is implemented such as inspection and maintenance cycle.