ABSTRACT

This paper mainly proceeds from the variation rules of short-term power load, combined with the characteristics of the high-order of the Grey prediction model, and proposes a relatively strong timeliness prediction method. Analysis shows that the method is in sync with the construction of the Grey model and has a theoretical basis. Finally the paper demonstrates the correctness and effectiveness of the proposed method.