ABSTRACT

ABSTRACT: The paper describes the construction process of the Special Engineering Structure bridges/viaducts, part of the 1st section of IC3 Condeixa/Coimbra, Pinhal Interior Motorway Concession.

1 INTRODUCTION

The 6 bridges/viaducts have an overall length of 2600.5 m, with two independent decks and current spans that vary between 37 m and 52 m (Fig. 1).