ABSTRACT

In the system, two AMD systems were installed on opposite sides of the 12th floor of the building. The masses for the TTC-AMD are provided by two 36 ton ice storage tanks used for the building" s air conditioner. Each mass is supported by four multi-stage rubber bearings and its motion is restricted to a single direction by a guide device.