ABSTRACT

The RIBA has developed a ‘Plan of Work’ which sets out various stages to a standard that is used by the UK construction industry. The latest version was published in 2013 and has eight stages, numbered 0–7. The Plan notes activities that need to take place at each stage and these are set out below the stage headings. The eight stages are: Stage 0 – Strategic Definition; Stage 1 – Preparation and Brief; Stage 2 – Concept Design; Stage 3 – Developed Design; Stage 4 – Technical Design; Stage 5 – Construction; Stage 6 – Handover and Close Out; and Stage 7 – In Use. Insurance falls under Stage 5; it is very important that the client has the necessary insurance cover to any existing building before construction work begins. The client should speak to his/her buildings insurance provider and tell them what work is being undertaken and the anticipated duration.