Answer: True 8. The term “value,” as it relates to the field of value improvement is determined by:

(circle correct letter)

a. The manufacturer b. The buyer c. The seller d. The value engineer e. The design engineer

9. The team should adjust the cost estimate upwards if the team determines that items of scope are not included in the original estimates.