ABSTRACT

This chapter addresses systematic resources allocation and management strategies. The differences between unconstrained PERT/CPM networks and resource-constrained networks are discussed. The resource loading and resource leveling strategies are presented. The resource idleness graph is introduced as a measure of the level of resource idleness in resource-constrained project schedules. Various resource allocation heuristics are presented. A procedure for calculating resource work rates to assess project productivity is presented.