Conveyors up to 10m long – – – 430.00 – nr 430.00 Conveyors up to 20m long – – – 780.00 – nr 780.00 Conveyors up to 50m long – – – 2180.00 – nr 2180.00

Conveyor belt width 400mm; mechanically loaded and removed at offload point; conveyor length

up to 5m – 1.50 35.63 15.97 – m3 51.60 10m – 1.50 35.63 16.44 – m3 52.07 12.5m – 1.50 35.63 16.99 – m3 52.62 15m – 1.50 35.63 17.38 – m3 53.01 20m – 1.50 35.63 18.31 – m3 53.94 25m – 1.50 35.63 19.49 – m3 55.12 30m – 1.50 35.63 20.66 – m3 56.29

Conveyor belt width 600mm; mechanically loaded and removed at offload point; conveyor length

up to 5m – 1.00 23.75 10.91 – m3 34.66 10m – 1.00 23.75 11.43 – m3 35.18 12.5m – 1.00 23.75 11.80 – m3 35.55 15m – 1.00 23.75 12.21 – m3 35.96 20m – 1.00 23.75 12.99 – m3 36.74 25m – 1.00 23.75 14.30 – m3 38.05 30m – 1.00 23.75 15.34 – m3 39.09

Conveyor belt width 400mm; mechanically loaded and removed by hand at offload point; conveyor length

up to 5m – 3.19 75.77 5.73 – m3 81.50 10m – 3.19 75.77 6.35 – m3 82.12 12.5m – 3.19 75.77 7.08 – m3 82.85 15m – 3.19 75.77 7.60 – m3 83.37 20m – 3.19 75.77 8.85 – m3 84.62 25m – 3.19 75.77 10.42 – m3 86.19 30m – 3.19 75.77 11.98 – m3 87.75

PC Labour Labour Plant Excluding site overheads and profit £ hours £ £ £ rate £

Terranova Cranes Ltd; crane hire; materials handling and lifting; telescopic cranes supply and management; exclusive of roadway management or planning applications; prices below illustrate lifts of 1 tonne at maximum crane reach; lift cycle of 0.25 hours; mechanical filling of material skip if appropriate 35 tonne mobile crane; lifting capacity of 1 tonne at 26m; C.P.A hire (all management by hirer)

granular materials including concrete – 0.75 17.81 17.38 – tonne 35.19 palletized or packed materials – 0.50 11.88 15.00 – tonne 26.88

35 tonne mobile crane; lifting capacity of 1 tonne at 26m; contract lift

granular materials or concrete – 0.75 17.81 44.88 – tonne 62.69 palletized or packed materials – 0.50 11.88 42.50 – tonne 54.38

50 tonne mobile crane; lifting capacity of 1 tonne at 34m; C.P.A hire (all management by hirer)

granular materials including concrete – 0.75 17.81 22.38 – tonne 40.19 palletized or packed materials – 1.00 23.75 20.00 – tonne 43.75

50 tonne mobile crane; lifting capacity of 1 tonne at 34m; contract lift

granular materials or concrete – 0.75 17.81 56.13 – tonne 73.94 palletized or packed materials – 0.50 11.88 53.75 – tonne 65.63

80 tonne mobile crane; lifting capacity of 1 tonne at 44m; C.P.A. hire (all management by hirer)

granular materials including concrete – 0.75 17.81 29.88 – tonne 47.69 palletized or packed materials – 0.50 11.88 27.50 – tonne 39.38

80 tonne mobile crane; lifting capacity of 1 tonne at 44m; contract lift

granular materials or concrete – 0.75 17.81 67.38 – tonne 85.19 palletized or packed materials – 0.50 11.88 65.00 – tonne 76.88

PC Labour Labour Plant Excluding site overheads and profit £ hours £ £ £ rate £

1.2.8 CONTRACTOR'S GENERAL COST ITEMS: TEMPORARY WORKS

Eve Trakway; portable roadway systems Temporary roadway system laid directly onto existing surface or onto PVC matting to protect existing surface; most systems are based on a weekly hire charge with transportation, installation and recovery charges included

Heavy Duty Trakpanel; per panel (3.05×2.59m) per week – – – – – m2 5.44 Outrigger Mats for use in conjunction with Heavy Duty Trakpanels; per set of 4mats per week – – – – – set 86.00 Medium Duty Trakpanel; per panel (2.44×3.00m) per week – – – – – m2 5.87 LD20 Eveolution; Light Duty Trakway; roll out system minimum delivery 50m – – – – – m2 5.73 Terraplas Walkways; turf protection system; per section (1×1m); per week – – – – – m2 5.60

1.4 UNDERGROUND SERVICES SURVEY

Ground penetrating radar surveys for artefacts, services and cable avoidance Areas not exceeding 1000m2 – – – – – nr 4900.00

1.4 BUILDING FABRIC SURVEY

Surveys Asbestos surveys

type 3 asbestos survey (destructive testing) to single storey free standing buildings such as park buildings, storage sheds and the like; total floor area less than 100m2 – – – – – nr 950.00 extra over for the removal only of asbestos off site to tip (tipping charges only) – – – – – tonne 120.00

PC Labour Labour Plant Excluding site overheads and profit £ hours £ £ £ rate £

1.5 TENDER AND CONTRACT DOCUMENTS

Note: The preliminary requirements are different for all projects. Many are time related and many are set costs. Others vary depending on the project requirements. We have attempted to provide a guide to the cost related items in Section A of the National Building Specification. These costs are a guide only. Users of the book should evaluate each project separately. There are other preliminary cost items which may be added in to the preliminary costs of any project which may not be featured here.