ABSTRACT
Permanent casings; each length not exceeding 13m 450mm diameter piles – – – – m 75.10 600mm diameter piles – – – – m 102.18 750mm diameter piles – – – – m 130.56
Permanent casings; each length exceeding 13m 450mm diameter piles – – – – m 73.79 600mm diameter piles – – – – m 108.41 750mm diameter piles – – – – m 130.56
Enlarged bases diameter 1400mm; to 450mm diameter piles – – – – nr 261.11 diameter 1800mm; to 600mm diameter piles – – – – nr 317.88 diameter 2100mm; to 750mm diameter piles – – – – nr 357.61
Cutting off surplus lengths 450mm diameter piles – – – – m 27.25 600mm diameter piles – – – – m 38.60 750mm diameter piles – – – – m 45.98
Preparing heads 450mm diameter piles – – – – nr 28.95 600mm diameter piles – – – – nr 51.08 750mm diameter piles – – – – nr 69.25 Collection from around pile heads of spoil accruing from piling operations and depositing in spoil heaps (For final disposal see Class E – Excavation Ancillaries) – – – – m3 3.40
hours £ £ £ rate £
Supply and fit reinforcement materials include for bars, tying wire, spacers, couplers and steel supports for bottom layer reinforcement (stools, chairs and risers).