ABSTRACT

Total Gang Rate/Hour 1.00 74.30 – – - 74.30 Bollards, furniture gang

1 ganger/chargehand (skill rate 4) 2.00 17.72 – – - 17.72 1 skilled operative (skill rate 4) 1.00 16.70 – – - 16.70 2 unskilled operatives (general) 2.00 31.18 – – - 31.18

Total Gang Rate/Hour 1.00 65.60 – – - 65.60

RESOURCES – PLANT Traffic signs

JCB 3CX backhoe – 50% of time – – 18.96 – - 18.96 125 cfm compressor – 50% of time – – 5.82 – - 5.82 compressor tools: hand held hammer drill – 50% of time – – 0.59 – - 0.59 compressor tools: clay spade – 50% of time – – 0.93 – - 0.93 compressor tools: extra 15m hose – 50% of time – – 0.16 – - 0.16 8 t lorry with hiab lift – 50% of time – – 14.29 – - 14.29

Total/Hour – – 40.75 – - 40.75 Bollards, furniture

125 cfm compressor – 50% of time – – 5.82 – - 5.82 compressor tools: hand held hammer drill – 50% of time – – 0.59 – - 0.59 compressor tools:clay spade – 50% of time – – 0.93 – - 0.93 compressor tools: extra 15m hose – 50% of time – – 0.16 – - 0.16 8 t lorry with hiab lift – 25% of time – – 7.14 – - 7.14

Total Rate/Hour – – 14.65 – - 14.65

TRAFFIC SIGNS In this section prices will vary depending upon the diagram configurations. The following are average costs of signs and Bollards. Diagram numbers refer to theTraffic Signs Regulations and General Directions 2002 and the figure numbers refer to the Traffic Signs Manual. Examples of Prime Costs for Class 1 (High Intensity) traffic and road signs (ex works) for orders exceeding £1,000.