ABSTRACT

The most recent Schedule is dated 31st August 2011 and is published by the Civil Engineering Contractors Association. Copies may be obtained from:

CIVIL ENGINEERING CONTRACTORS ASSOCIATION 1 Birdcage Walk London SW1H 9JJ Tel: 020 7340 0450

These schedules identify a number of items that are excluded from the rates and percentages quoted, but should be recovered by the Contractor when valuing his Daywork account. Under normal circumstances it is impractical to accurately value these items for each Daywork event, although certain items can be allowed for by means of a percentage addition. Suggested methods of calculating such additions are included in this section.