ABSTRACT

For structural safety, it is a necessity to provide channel protection to counter the problem of scouring. To minimise the cost of such provision, measures are needed to speed up the transition from supercritical to subcritical flow. The efficiency of such measures will have a direct impact on economics of hydroelectric schemes involving spillway structures.