ABSTRACT

Operation at other them 60 Hz is normally a result of occurrences on the connected power system. Overfrequency operation results when generation excess exists. This condition would occur following loss of major load or a major tie line that exports power. Conversely, underfrequency operation occurs as a result of a generation deficiency caused by the loss of a large generator or loss of a major importing tie line.