ABSTRACT

T HIS chapter begins with the assumption that you are bynow somewhat familiar with the building plans for the project example, and that the initial drafting (blocking out) of the building layout is complete. Your sheet now looks something like the example on page 140 labeled Figure A-1. As is the typical procedure, what you have traced for areas of exposed construction is the architect’s “floor plan,” and what you have traced for areas with finished construction is a close copy of the architect’s “reflected ceiling plan.”