ABSTRACT

While the size of critical reactors may be arbitrary, the presence of a localized primary neutron source constrains the size and total power of hybrid reactors. In this chapter we shall examine this issue, first using a simple, intuitive spherical reactor model, and then taking the example of the optimization of the size of a possible demonstration set-up.