ABSTRACT

In this section we extend to refrigeration plants the optimization method used in Section 8.1 for power plants. As shown on the left side of Figure 10.1, the refrigerati~n plant absorbs the refrigeration load QL at the temperature level Tv ~d rejects Qn to the ambient, T n· The power required to accomplish this task is W.