Couplings polypropylene coupling, 100mm dia. – – – 6.75 nr 6.75 polypropylene coupling, 150mm dia. – – – 12.26 nr 12.26 polypropylene coupling, 225mm dia. – – – 23.52 nr 23.52 polypropylene coupling, 300mm dia. – – – 48.30 nr 48.30

Tapers plain end; taper reducer, 225-150mm – – – 120.83 nr 120.83 plain end; taper reducer, 150-100mm – – – 54.13 nr 54.13

Field drains to BS 1196, butt joints, nominal bore; Hepworth

300mm lengths; 75mm dia. – – – 2.73 nr 2.73 300mm lengths; 100mm dia. – – – 3.81 nr 3.81 300mm lengths; 150mm dia. – – – 7.82 nr 7.82 300mm lengths; 225mm dia. – – – 20.10 nr 20.10

Perforated vitrified clay sleeved pipe, BS EN295; Hepline

1.6m lengths;100mm dia. – – – 24.52 m 24.52 1.75m lngth; 225mm dia. – – – 55.95 m 55.95 1.75m lngth; 150mm dia. – – – 48.76 m 48.76 1.75m lngth; 300mm dia. – – – 114.80 m 114.80

Concrete pipes Concrete pipes, BS5911 Class L

300mm dia. – – – 18.07 m 18.07 375mm dia. – – – 22.38 m 22.38 450mm dia. – – – 26.41 m 26.41 525mm dia. – – – 34.62 m 34.62 750mm dia. – – – 87.72 m 87.72 900mm dia. – – – 117.70 m 117.70 1200mm dia. – – – 201.96 m 201.96 1500mm dia. – – – 356.43 m 356.43 1800mm dia. – – – 495.72 m 495.72 2100mm dia. – – – 622.20 m 622.20

hours £ £ £ rate £

RESOURCES – MATERIALS – cont

Concrete pipes – cont Bends

bend; 300mm dia.; <45° – – – 180.74 nr 180.74 bend; 375mm dia.; <45° – – – 180.74 nr 180.74 bend; 450mm dia.; <45° – – – 264.08 nr 264.08 bend; 525mm dia.; <45° – – – 346.19 nr 346.19 bend; 750mm dia.; <45° – – – 877.20 nr 877.20 bend; 900mm dia.; 45-90° – – – 1176.98 nr 1176.98 bend; 1200mm dia.; <45° – – – 2019.60 nr 2019.60 bend; 1500mm dia.; <45° – – – 3563.88 nr 3563.88 bend; 1800mm dia.; <45° – – – 4959.24 nr 4959.24 bend; 2100mm dia.; <45° – – – 6132.75 nr 6132.75

Cast iron pipes and fittings Cast iron drain BS EN 877; plain end

70mm dia. – – – 20.50 m 20.50 100mm dia. – – – 24.39 m 24.39 150mm dia. – – – 48.33 m 48.33 250mm dia. – – – 112.83 m 112.83

Cast iron couplings complete with stainless steel nuts and bolts and synthetic rubber gaskets

70mm dia. – – – 8.77 nr 8.77 100mm dia. – – – 11.41 nr 11.41 150mm dia. – – – 22.87 nr 22.87 250mm dia. – – – 73.26 nr 73.26

Bends; 45° 70mm dia. – – – 15.51 nr 15.51 150mm dia. – – – 32.98 nr 32.98 100mm dia. – – – 18.36 nr 18.36 250mm dia. – – – 191.59 nr 191.59

Bends; short radius; 87.5° 70mm dia. – – – 15.51 nr 15.51 100mm dia. – – – 18.36 nr 18.36 150mm dia. – – – 32.98 nr 32.98 250mm dia. – – – 191.59 nr 191.59

Single junction × 45° 70×70mm dia. – – – 23.45 nr 23.45 100× 100mm – – – 29.73 nr 29.73 150× 150mm – – – 71.15 nr 71.15 250× 250mm dia. – – – 429.09 nr 429.09

Taper reducer pipes 70mm dia. – – – 21.20 nr 21.20 100mm dia. – – – 24.93 nr 24.93 150mm dia. – – – 47.85 nr 47.85 250mm dia. – – – 160.52 nr 160.52

hours £ £ £ rate £

RESOURCES – PLANT Field drains

0.4m3 hydraulic backacter 37.03 2 t dumper – 30% of time 1.98 Stihl saw, 12", petrol – 30% of time 0.28 small pump – 30% of time 1.11

Total Rate/Hour £ 40.40 Add to the above for trench supports appropriate to trench depth (see below)

Field drains (not in trenches) 2 t dumper – 30% of time 1.98 Stihl saw, 12", petrol – 30% of time 0.28

Total Rate/Hour £ 2.26 Drains/sewers (small bore)

1.0m3 hydraulic backacter 55.30 2 t dumper – 30% of time 1.98 2.80m3/min compressor, 2 tool – 30% of time 2.21 disc saw – 30% of time 0.30 extra 50 ft/15m hose – 30% of time 0.09 small pump – 30% of time 1.11 sundry tools – 30% of time 0.38

Total Rate/Hour £ 61.37 Add to the above for trench supports appropriate to trench depth (see below)

Drains/sewers (small bore – not in trenches) 2 t dumper – 30% of time 1.98 2.80m3/min compressor, 2 tool – 30% of time 2.21 disc saw – 30% of time 0.30 extra 50 ft/15m hose – 30% of time 0.09 sundry tools – 30% of time 0.38 Total Rate/Hour £ 4.96

Drains/sewers (large bore) 1.0m3 hydraulic backacter 55.30 20 t crawler crane – 50% of time 25.08 2 t dumper (30% of time) 1.98 2.80m3/min compressor, 2 tool – 30% of time 2.21 disc saw – 30% of time 0.30 extra 50 ft/15m hose – 30% of time 0.09 small pump – 30% of time 1.11 sundry tools – 30% of time 0.38 Total Rate/Hour £ 86.44 Add to the above for trench supports appropriate to trench depth (see below)

Drains/sewers (large bore – not in trenches) 2 t dumper (30% of time) 1.98 2.80m3/min compressor, 2 tool – 30% of time 2.21 disc saw – 30% of time 0.30 extra 50 ft/15m hose – 30% of time 0.09 sundry tools – 30% of time 0.38 Total Rate/Hour £ 4.96

hours £ £ £ rate £

RESOURCES – PLANT – cont Trench supports

In addition to the above, the following allowances for close sheeted trench supports are included in the following unit rates, assuming that the ground conditions warrants it:

ne 1.50m deep 3.94 m 1.50-2.00m deep 5.49 m 2.00-2.50m deep 5.25 m 2.50-3.00m deep 6.47 m 3.00-3.50m deep 7.86 m 3.50-4.00m deep 8.66 m 4.00-4.50m deep 9.69 m 4.50-5.00m deep 17.15 m 5.00-5.50m deep 23.63 m

CLAY PIPES

Field drains to BS 1196, butt joints, nominal bore; excavation and supports, backfilling 75mm pipes; in trench, depth

not in trenches 0.06 2.83 0.05 9.31 m 12.19 ne 1.50m deep 0.09 6.53 3.64 9.31 m 19.48 1.50-2.00m deep 0.13 9.43 5.28 9.31 m 24.02 2.00-2.50m deep 0.18 13.06 7.32 9.31 m 29.69 2.50-3.00m deep 0.23 16.69 9.35 9.31 m 35.35

100mm pipes; in trench, depth not in trenches 0.06 2.83 0.05 13.03 m 15.91 ne 1.50m deep 0.10 7.26 4.05 13.03 m 24.34 1.50-2.00m deep 0.14 10.16 5.69 13.03 m 28.88 2.00-2.50m deep 0.19 13.79 7.71 13.03 m 34.53 2.50-3.00m deep 0.24 17.42 9.76 13.03 m 40.21

150mm pipes; in trench, depth not in trenches 0.06 2.83 0.05 26.70 m 29.58 ne 1.50m deep 0.11 7.98 4.45 26.70 m 39.13 1.50-2.00m deep 0.15 10.88 6.09 26.70 m 43.67 2.00-2.50m deep 0.20 14.51 8.12 26.70 m 49.33 2.50-3.00m deep 0.25 18.14 10.17 26.70 m 55.01

225mm pipes; in trench, depth not in trenches 0.06 2.83 0.05 68.67 m 71.55 ne 1.50m deep 0.13 9.43 5.26 68.67 m 83.36 1.50-2.00m deep 0.17 12.34 6.91 68.67 m 87.92 2.00-2.50m deep 0.22 15.96 8.94 68.67 m 93.57 2.50-3.00m deep 0.27 19.59 10.97 68.67 m 99.23

hours £ £ £ rate £

Vitrified clay perforated field drains to BS EN295, sleeved joints; excavation and supports, backfilling 100mm pipes; in trench, depth

not in trenches 0.06 2.83 0.05 25.14 m 28.02 ne 1.50m deep 0.15 10.88 6.06 25.14 m 42.08 1.50-2.00m deep 0.19 13.79 7.71 25.14 m 46.64 2.00-2.50m deep 0.24 17.42 9.74 25.14 m 52.30 2.50-3.00m deep 0.29 21.04 11.79 25.14 m 57.97

Extra for bend 0.08 5.81 – 10.69 nr 16.50 Extra for single junction 0.09 6.53 – 23.07 nr 29.60

150mm pipes; in trench, depth not in trenches 0.06 2.83 0.05 49.97 m 52.85 ne 1.50m deep 0.17 12.34 6.88 49.97 m 69.19 1.50-2.00m deep 0.20 14.51 8.12 49.97 m 72.60 2.00-2.50m deep 0.24 17.42 9.74 49.97 m 77.13 2.50-3.00m deep 0.29 21.04 11.79 49.97 m 82.80

Extra for bend 0.13 9.07 – 22.01 nr 31.08 Extra for single junction 0.13 9.43 – 32.32 nr 41.75

225mm pipes; in trench, depth not in trenches 0.08 3.78 0.05 57.35 m 61.18 ne 1.50m deep 0.18 13.06 7.29 57.35 m 77.70 1.50-2.00m deep 0.22 15.96 8.94 57.35 m 82.25 2.00-2.50m deep 0.26 18.87 10.57 57.35 m 86.79 2.50-3.00m deep 0.30 21.77 12.21 57.35 m 91.33

Extra for bend 0.12 8.71 – 112.22 nr 120.93 Extra for single junction 0.20 14.15 – 156.66 nr 170.81

300mm pipes; in trench, depth not in trenches 0.10 4.72 0.23 117.67 m 122.62 ne 1.50m deep 0.19 13.79 7.68 117.67 m 139.14 1.50-2.00m deep 0.24 17.42 9.75 117.67 m 144.84 2.00-2.50m deep 0.28 20.32 11.37 117.67 m 149.36 2.50-3.00m deep 0.32 23.22 13.01 117.67 m 153.90

Extra for bend 0.24 17.42 – 213.13 nr 230.55 Extra for single junction 0.23 16.69 – 402.12 nr 418.81

Vitrified clay pipes to BS EN295, plain ends with push-fit polypropylene flexible couplings; excavation and supports, backfilling 100mm pipes; in trenches, depth

not in trenches 0.06 2.83 0.31 13.70 m 16.84 ne 1.50m deep 0.15 10.88 9.06 13.70 m 33.64 1.50-2.00m deep 0.19 13.79 11.69 13.70 m 39.18 2.00-2.50m deep 0.24 17.42 14.78 13.70 m 45.90 2.50-3.00m deep 0.29 21.04 17.88 13.70 m 52.62 3.00-3.50m deep 0.36 26.12 22.20 13.70 m 62.02 3.50-4.00m deep 0.44 31.93 27.16 13.70 m 72.79 4.00-4.50m deep 0.55 39.91 33.96 13.70 m 87.57 4.50-5.00m deep 0.70 50.80 43.29 13.70 m 107.79 5.00-5.50m deep 0.90 65.31 55.68 13.70 m 134.69

Extra for bend 0.05 3.63 – 26.82 nr 30.45 Extra for rest bend 0.06 4.35 – 43.70 nr 48.05 Extra for single junction; equal 0.09 6.53 – 48.58 nr 55.11 Extra for saddle; oblique 0.23 16.69 – 33.91 nr 50.60

hours £ £ £ rate £

CLAY PIPES – cont

Vitrified clay pipes to BS EN295, plain ends with push-fit polypropylene flexible couplings – cont 150mm pipes; in trenches, depth

not in trenches 0.06 2.83 0.31 26.14 m 29.28 ne 1.50m deep 0.17 12.34 10.45 26.14 m 48.93 1.50-2.00m deep 0.20 14.51 12.32 26.14 m 52.97 2.00-2.50m deep 0.24 17.42 14.78 26.14 m 58.34 2.50-3.00m deep 0.29 21.04 17.88 26.14 m 65.06 3.00-3.50m deep 0.39 28.30 24.04 26.14 m 78.48 3.50-4.00m deep 0.45 32.65 27.79 26.14 m 86.58 4.00-4.50m deep 0.58 42.09 35.84 26.14 m 104.07 4.50-5.00m deep 0.75 54.42 46.36 26.14 m 126.92 5.00-5.50m deep 0.96 69.66 59.37 26.14 m 155.17

Extra for bend 0.08 5.81 – 51.81 nr 57.62 Extra for rest bend 0.09 6.53 – 59.22 nr 65.75 Extra for single junction; equal 0.11 7.98 – 75.03 nr 83.01 Extra for taper reducer 0.07 5.08 – 75.44 nr 80.52 Extra for saddle; oblique 0.29 21.04 – 52.56 nr 73.60

225mm pipes; in trenches, depth not in trenches 0.08 3.78 0.40 74.25 m 78.43 ne 1.50m deep 0.18 13.06 11.06 74.25 m 98.37 1.50-2.00m deep 0.22 15.96 13.56 74.25 m 103.77 2.00-2.50m deep 0.26 18.87 16.03 74.25 m 109.15 2.50-3.00m deep 0.30 21.77 18.50 74.25 m 114.52 3.00-3.50m deep 0.41 29.75 25.29 74.25 m 129.29 3.50-4.00m deep 0.47 34.11 29.01 74.25 m 137.37 4.00-4.50m deep 0.65 47.17 40.16 74.25 m 161.58 4.50-5.00m deep 0.80 58.05 49.45 74.25 m 181.75 5.00-5.50m deep 1.02 74.02 63.10 74.25 m 211.37

Extra for bend 0.10 7.26 – 101.74 nr 109.00 Extra for rest bend 0.11 7.98 – 194.66 nr 202.64 Extra for single junction; equal 0.16 11.61 – 310.05 nr 321.66 Extra for taper reducer 0.12 8.71 – 161.42 nr 170.13 Extra for saddle; oblique 0.36 26.12 – 173.16 nr 199.28

300mm pipes; in trenches, depth not in trenches 0.10 4.72 0.51 113.51 m 118.74 ne 1.50m deep 0.19 13.79 11.66 113.51 m 138.96 1.50-2.00m deep 0.24 17.42 14.78 113.51 m 145.71 2.00-2.50m deep 0.28 20.32 17.24 113.51 m 151.07 2.50-3.00m deep 0.32 23.22 19.72 113.51 m 156.45 3.00-3.50m deep 0.42 30.48 25.92 113.51 m 169.91 3.50-4.00m deep 0.52 37.73 32.10 113.51 m 183.34 4.00-4.50m deep 0.70 50.80 43.25 113.51 m 207.56 4.50-5.00m deep 0.90 65.31 55.65 113.51 m 234.47 5.00-5.50m deep 1.12 81.27 69.27 113.51 m 264.05

Extra for bend 0.15 10.88 – 155.57 nr 166.45 Extra for rest bend 0.16 11.61 – 485.35 nr 496.96 Extra for single junction; equal 0.19 13.79 – 555.68 nr 569.47 Extra for saddle; oblique 0.44 31.93 – 309.04 nr 340.97

hours £ £ £ rate £

Vitrified clay pipes to BS EN295, spigot and socket joints with sealing ring; excavation and supports, backfilling 100mm pipes; in trenches, depth

not in trenches 0.06 2.83 0.33 7.42 m 10.58 ne 1.50m deep 0.15 10.88 9.33 7.42 m 27.63 1.50-2.00m deep 0.19 13.79 11.69 7.42 m 32.90 2.00-2.50m deep 0.24 17.42 14.78 7.42 m 39.62 2.50-3.00m deep 0.29 21.04 17.88 7.42 m 46.34 3.00-3.50m deep 0.36 26.12 22.20 7.42 m 55.74 3.50-4.00m deep 0.44 31.93 27.16 7.42 m 66.51 4.00-4.50m deep 0.55 39.91 33.96 7.42 m 81.29 4.50-5.00m deep 0.70 50.80 43.29 7.42 m 101.51 5.00-5.50m deep 0.90 65.31 55.68 7.42 m 128.41

Extra for bend 0.05 3.63 – 19.52 nr 23.15 Extra for rest bend 0.06 4.35 – 29.75 nr 34.10 Extra for single junction; equal 0.09 6.53 – 27.33 nr 33.86 Extra fro saddle; oblique 0.23 16.69 – 26.83 nr 43.52

150mm pipes; in trenches, depth not in trenches 0.06 2.83 0.31 11.28 m 14.42 ne 1.50m deep 0.17 12.34 10.45 11.28 m 34.07 1.50-2.00m deep 0.20 14.51 12.32 11.28 m 38.11 2.00-2.50m deep 0.24 17.42 14.78 11.28 m 43.48 2.50-3.00m deep 0.29 21.04 17.88 11.28 m 50.20 3.00-3.50m deep 0.39 28.30 24.04 11.28 m 63.62 3.50-4.00m deep 0.45 32.65 27.79 11.28 m 71.72 4.00-4.50m deep 0.58 42.09 35.84 11.28 m 89.21 4.50-5.00m deep 0.75 54.42 46.36 11.28 m 112.06 5.00-5.50m deep 0.96 69.66 59.37 11.28 m 140.31

Extra for bend 0.08 5.81 – 26.05 nr 31.86 Extra for rest bend 0.09 6.53 – 33.47 nr 40.00 Extra for single junction; equal 0.11 7.98 – 34.87 nr 42.85 Extra for double junction; equal 0.13 9.43 – 55.15 nr 64.58 Extra for taper reducer 0.07 5.08 – 55.48 nr 60.56 Extra for saddle; oblique 0.29 21.04 – 39.91 nr 60.95

225mm pipes; in trenches, depth not in trenches 0.08 3.78 0.40 25.33 m 29.51 ne 1.50m deep 0.18 13.06 11.07 25.33 m 49.46 1.50-2.00m deep 0.22 15.96 13.56 25.33 m 54.85 2.00-2.50m deep 0.26 18.87 16.03 25.33 m 60.23 2.50-3.00m deep 0.30 21.77 18.50 25.33 m 65.60 3.00-3.50m deep 0.41 29.75 25.29 25.33 m 80.37 3.50-4.00m deep 0.47 34.11 28.98 25.33 m 88.42 4.00-4.50m deep 0.65 47.17 40.16 25.33 m 112.66 4.50-5.00m deep 0.80 58.05 49.45 25.33 m 132.83 5.00-5.50m deep 1.02 74.02 63.10 25.33 m 162.45

Extra for bend 0.10 7.26 – 132.84 nr 140.10 Extra for rest bend 0.11 7.98 – 145.26 nr 153.24 Extra for single junction; equal 0.16 11.61 – 185.43 nr 197.04 Extra for double junction; equal 0.18 13.06 – 168.37 nr 181.43 Extra for taper reducer 0.12 8.71 – 123.41 nr 132.12 Extra for saddle; obligue 0.36 26.12 – 148.46 nr 174.58

hours £ £ £ rate £

CLAY PIPES – cont

Vitrified clay pipes to BS EN295, spigot and socket joints with sealing ring – cont 300mm pipes; in trenches, depth

not in trenches 0.10 4.72 0.51 32.41 m 37.64 ne 1.50m deep 0.19 13.79 11.66 32.41 m 57.86 1.50-2.00m deep 0.24 17.42 14.78 32.41 m 64.61 2.00-2.50m deep 0.28 20.32 17.24 32.41 m 69.97 2.50-3.00m deep 0.32 23.22 19.72 32.41 m 75.35 3.00-3.50m deep 0.42 30.48 25.92 32.41 m 88.81 3.50-4.00m deep 0.52 37.73 32.10 32.41 m 102.24 4.00-4.50m deep 0.70 50.80 43.25 32.41 m 126.46 4.50-5.00m deep 0.90 65.31 55.65 32.41 m 153.37 5.00-5.50m deep 1.12 81.27 69.27 32.41 m 182.95

Extra for bend 0.15 10.88 – 252.25 nr 263.13 Extra for rest bend 0.16 11.61 – 383.92 nr 395.53 Extra for single junction; equal 0.19 13.79 – 397.24 nr 411.03 Extra for double junction; equal 0.21 15.24 – 386.48 nr 401.72 Extra for taper reducer 0.15 10.88 – 243.50 nr 254.38 Extra for saddle; oblique 0.44 31.93 – 258.33 nr 290.26

400mm pipes; in trenches, depth not in trenches 0.10 4.72 0.51 109.09 m 114.32 ne 1.50m deep 0.23 16.69 14.12 109.09 m 139.90 1.50-2.00m deep 0.29 21.04 17.87 109.09 m 148.00 2.00-2.50m deep 0.32 23.22 19.71 109.09 m 152.02 2.50-3.00m deep 0.38 27.57 23.43 109.09 m 160.09 3.00-3.50m deep 0.46 33.38 28.38 109.09 m 170.85 3.50-4.00m deep 0.58 42.09 35.82 109.09 m 187.00 4.00-4.50m deep 0.75 54.42 46.32 109.09 m 209.83 4.50-5.00m deep 0.95 68.94 58.72 109.09 m 236.75 5.00-5.50m deep 1.20 87.08 74.22 109.09 m 270.39

Extra for bend; 90° 0.24 17.42 – 673.17 nr 690.59 Extra for bend; 45° 0.24 17.42 – 673.17 nr 690.59 Extra for bend; 22.5° 0.24 17.42 – 673.17 nr 690.59

450mm pipes; in trenches, depth not in trenches 0.23 10.87 1.14 122.06 m 134.07 ne 1.50m deep 0.23 16.69 14.12 122.06 m 152.87 1.50-2.00m deep 0.30 21.77 18.49 122.06 m 162.32 2.00-2.50m deep 0.32 23.22 19.71 122.06 m 164.99 2.50-3.00m deep 0.38 27.57 23.43 122.06 m 173.06 3.00-3.50m deep 0.47 34.11 28.98 122.06 m 185.15 3.50-4.00m deep 0.60 43.54 37.04 122.06 m 202.64 4.00-4.50m deep 0.77 55.88 47.57 122.06 m 225.51 4.50-5.00m deep 0.97 70.39 59.97 122.06 m 252.42 5.00-5.50m deep 1.20 87.08 74.22 122.06 m 283.36

Extra for bend; 90° 0.29 21.04 – 886.44 nr 907.48 Extra for bend; 45° 0.29 21.04 – 886.44 nr 907.48 Extra for bend; 22.5° 0.29 21.04 – 886.44 nr 907.48

hours £ £ £ rate £

CONCRETE PIPES

Concrete porous pipes to BS 5911; excavation and supports, backfilling 150mm pipes; in trench, depth

not in trenches 0.06 2.83 0.28 5.69 m 8.80 ne 1.50m deep 0.17 12.34 6.88 5.69 m 24.91 1.50-2.00m deep 0.20 14.51 8.12 5.69 m 28.32 2.00-2.50m deep 0.24 17.42 9.74 5.69 m 32.85 2.50-3.00m deep 0.29 21.04 11.79 5.69 m 38.52 3.00-3.50m deep 0.39 28.30 15.87 5.69 m 49.86 3.50-4.00m deep 0.45 32.65 18.35 5.69 m 56.69 4.00-4.50m deep 0.58 42.09 23.67 5.69 m 71.45 4.50-5.00m deep 0.75 54.42 30.63 5.69 m 90.74 5.00-5.50m deep 0.96 69.66 39.24 5.69 m 114.59

225mm pipes; in trench, depth not in trenches 0.08 3.78 0.18 6.12 m 10.08 ne 1.50m deep 0.18 13.06 7.29 6.12 m 26.47 1.50-2.00m deep 0.22 15.96 8.94 6.12 m 31.02 2.00-2.50m deep 0.26 18.87 10.57 6.12 m 35.56 2.50-3.00m deep 0.30 21.77 12.21 6.12 m 40.10 3.00-3.50m deep 0.41 29.75 16.69 6.12 m 52.56 3.50-4.00m deep 0.47 34.11 19.16 6.12 m 59.39 4.00-4.50m deep 0.65 47.17 26.52 6.12 m 79.81 4.50-5.00m deep 0.80 58.05 32.68 6.12 m 96.85 5.00-5.50m deep 1.02 74.02 41.70 6.12 m 121.84

300mm pipes; in trench, depth not in trenches 0.10 4.72 0.23 6.74 m 11.69 ne 1.50m deep 0.19 13.79 7.68 6.74 m 28.21 1.50-2.00m deep 0.24 17.42 9.75 6.74 m 33.91 2.00-2.50m deep 0.28 20.32 11.37 6.74 m 38.43 2.50-3.00m deep 0.32 23.22 13.01 6.74 m 42.97 3.00-3.50m deep 0.42 30.48 17.10 6.74 m 54.32 3.50-4.00m deep 0.52 37.73 21.20 6.74 m 65.67 4.00-4.50m deep 0.70 50.80 28.57 6.74 m 86.11 4.50-5.00m deep 0.90 65.31 36.77 6.74 m 108.82 5.00-5.50m deep 1.12 81.27 45.78 6.74 m 133.79

Concrete pipes with rebated flexible joints to BS 5911 Class 120; excavation and supports, backfilling 300mm pipes; in trenches, depth

not in trenches 0.12 5.67 0.31 18.07 m 24.05 ne 1.50m deep 0.22 15.96 13.53 18.07 m 47.56 1.50-2.00m deep 0.26 18.87 16.03 18.07 m 52.97 2.00-2.50m deep 0.30 21.77 18.49 18.07 m 58.33 2.50-3.00m deep 0.34 24.67 20.97 18.07 m 63.71 3.00-3.50m deep 0.44 31.93 27.13 18.07 m 77.13 3.50-4.00m deep 0.56 40.64 34.57 18.07 m 93.28

hours £ £ £ rate £

CONCRETE PIPES – cont

Concrete pipes with rebated flexible joints to BS 5911 Class 120 – cont 300mm pipes – cont

4.00-4.50m deep 0.73 52.97 45.10 18.07 m 116.14 4.50-5.00m deep 0.92 66.76 56.87 18.07 m 141.70 5.00-5.50m deep 1.19 86.35 73.59 18.07 m 178.01 5.50-6.00m deep 1.42 103.04 87.91 18.07 m 209.02

Extra for bend 0.08 5.81 4.52 180.74 nr 191.07 375mm pipes; in trenches, depth

not in trenches 0.15 7.09 0.74 22.38 m 30.21 ne 1.50m deep 0.24 17.42 14.74 22.38 m 54.54 1.50-2.00m deep 0.29 21.04 17.87 22.38 m 61.29 2.00-2.50m deep 0.33 23.95 20.33 22.38 m 66.66 2.50-3.00m deep 0.38 27.57 23.43 22.38 m 73.38 3.00-3.50m deep 0.46 33.38 28.38 22.38 m 84.14 3.50-4.00m deep 0.58 42.09 35.82 22.38 m 100.29 4.00-4.50m deep 0.75 54.42 46.32 22.38 m 123.12 4.50-5.00m deep 0.95 68.94 58.72 22.38 m 150.04 5.00-5.50m deep 1.20 87.08 74.22 22.38 m 183.68 5.50-6.00m deep 1.45 105.22 89.76 22.38 m 217.36

Extra for bend 0.10 7.26 6.31 180.74 nr 194.31 450mm pipes; in trenches, depth

not in trenches 0.17 8.03 0.85 26.41 m 35.29 ne 1.50m deep 0.25 18.14 15.36 26.41 m 59.91 1.50-2.00m deep 0.31 22.50 19.08 26.41 m 67.99 2.00-2.50m deep 0.35 25.40 21.56 26.41 m 73.37 2.50-3.00m deep 0.40 29.03 24.65 26.41 m 80.09 3.00-3.50m deep 0.48 34.83 29.65 26.41 m 90.89 3.50-4.00m deep 0.63 45.72 38.89 26.41 m 111.02 4.00-4.50m deep 0.80 58.05 49.41 26.41 m 133.87 4.50-5.00m deep 1.00 72.56 61.82 26.41 m 160.79 5.00-5.50m deep 1.25 90.71 77.32 26.41 m 194.44 5.50-6.00m deep 1.51 109.57 93.46 26.41 m 229.44

Extra for bend 0.13 9.43 9.04 264.08 nr 282.55 525mm pipes; in trenches, depth

not in trenches 0.20 9.45 0.99 34.62 m 45.06 ne 1.50m deep 0.27 19.59 16.58 34.62 m 70.79 1.50-2.00m deep 0.33 23.95 20.33 34.62 m 78.90 2.00-2.50m deep 0.37 26.85 22.79 34.62 m 84.26 2.50-3.00m deep 0.42 30.48 25.90 34.62 m 91.00 3.00-3.50m deep 0.49 35.56 30.23 34.62 m 100.41 3.50-4.00m deep 0.65 47.17 40.14 34.62 m 121.93 4.00-4.50m deep 0.83 60.23 51.26 34.62 m 146.11 4.50-5.00m deep 1.03 74.74 63.67 34.62 m 173.03 5.00-5.50m deep 1.28 92.88 79.17 34.62 m 206.67 5.50-6.00m deep 1.55 112.48 95.93 34.62 m 243.03

Extra for bend 0.16 11.61 11.74 346.19 nr 369.54

hours £ £ £ rate £

750mm pipes; in trenches, depth not in trenches 0.22 10.39 1.10 87.72 m 99.21 ne 1.50m deep 0.30 19.24 25.96 87.72 m 132.92 1.50-2.00m deep 0.36 23.09 31.20 87.72 m 142.01 2.00-2.50m deep 0.41 26.29 35.54 87.72 m 149.55 2.50-3.00m deep 0.47 30.14 40.74 87.72 m 158.60 3.00-3.50m deep 0.58 37.19 50.33 87.72 m 175.24 3.50-4.00m deep 0.80 51.30 69.45 87.72 m 208.47 4.00-4.50m deep 1.05 67.33 91.19 87.72 m 246.24 4.50-5.00m deep 1.30 83.36 112.98 87.72 m 284.06 5.00-5.50m deep 1.55 99.39 134.72 87.72 m 321.83 5.50-6.00m deep 1.82 116.71 158.31 87.72 m 362.74

Extra for bends 0.24 15.39 34.09 877.20 nr 926.68 900mm pipes; in trenches, depth

not in trenches 0.25 11.81 1.24 117.70 m 130.75 ne 1.50m deep 0.33 21.16 28.55 117.70 m 167.41 1.50-2.00m deep 0.40 25.65 34.66 117.70 m 178.01 2.00-2.50m deep 0.46 29.50 39.88 117.70 m 187.08 2.50-3.00m deep 0.53 33.99 45.96 117.70 m 197.65 3.00-3.50m deep 0.70 44.89 60.74 117.70 m 223.33 3.50-4.00m deep 0.92 58.99 79.87 117.70 m 256.56 4.00-4.50m deep 1.20 76.95 104.21 117.70 m 298.86 4.50-5.00m deep 1.50 96.19 130.36 117.70 m 344.25 5.00-5.50m deep 1.80 115.42 156.46 117.70 m 389.58 5.50-6.00m deep 2.10 134.66 182.66 117.70 m 435.02

Extra for bends 0.39 25.01 55.85 1176.98 nr 1257.84 1200mm pipes; in trenches, depth

not in trenches 0.25 11.81 1.24 201.96 m 215.01 ne 1.50m deep 0.46 29.50 39.80 201.96 m 271.26 1.50-2.00m deep 0.53 33.99 45.93 201.96 m 281.88 2.00-2.50m deep 0.60 38.48 51.99 201.96 m 292.43 2.50-3.00m deep 0.70 44.89 60.71 201.96 m 307.56 3.00-3.50m deep 0.85 54.51 73.74 201.96 m 330.21 3.50-4.00m deep 1.12 71.82 97.23 201.96 m 371.01 4.00-4.50m deep 1.45 92.98 125.93 201.96 m 420.87 4.50-5.00m deep 1.75 112.22 152.06 201.96 m 466.24 5.00-5.50m deep 2.05 131.46 178.20 201.96 m 511.62 5.50-6.00m deep 2.36 151.34 205.26 201.96 m 558.56

Extra for bends 0.51 32.70 73.24 2019.60 nr 2125.54 1500mm pipes; in trenches, depth

not in trenches 0.35 16.54 1.73 356.43 m 374.70 ne 1.50m deep 0.60 38.48 51.90 356.43 m 446.81 1.50-2.00m deep 0.70 44.89 60.67 356.43 m 461.99 2.00-2.50m deep 0.81 51.94 70.20 356.43 m 478.57 2.50-3.00m deep 0.92 58.99 79.77 356.43 m 495.19 3.00-3.50m deep 1.05 67.33 91.09 356.43 m 514.85 3.50-4.00m deep 1.27 81.44 110.25 356.43 m 548.12 4.00-4.50m deep 1.70 109.01 147.65 356.43 m 613.09 4.50-5.00m deep 2.05 131.46 178.14 356.43 m 666.03 5.00-5.50m deep 2.40 153.90 208.62 356.43 m 718.95 5.50-6.00m deep 2.75 176.34 236.77 359.35 m 772.46

Extra for bends 0.63 40.40 90.47 3563.88 nr 3694.75

hours £ £ £ rate £

CONCRETE PIPES – cont

Concrete pipes with rebated flexible joints to BS 5911 Class 120 – cont 1800mm pipes; in trenches, depth

not in trenches 0.40 18.90 1.98 495.72 m 516.60 ne 1.50m deep 0.77 49.38 66.61 495.72 m 611.71 1.50-2.00m deep 0.91 58.35 78.85 495.72 m 632.92 2.00-2.50m deep 1.03 66.05 89.25 495.72 m 651.02 2.50-3.00m deep 1.12 71.82 97.11 495.72 m 664.65 3.00-3.50m deep 1.20 76.95 104.09 495.72 m 676.76 3.50-4.00m deep 1.52 97.47 131.96 495.72 m 725.15 4.00-4.50m deep 2.00 128.25 173.69 495.72 m 797.66 4.50-5.00m deep 2.40 153.90 208.54 495.72 m 858.16 5.00-5.50m deep 2.80 179.55 243.39 495.72 m 918.66 5.50-6.00m deep 3.15 201.99 273.96 495.72 m 971.67

Extra for bends 0.77 49.38 110.59 4959.24 nr 5119.21 2100mm pipes; in trenches, depth

not in trenches 0.45 21.26 2.24 622.20 m 645.70 ne 1.50m deep 0.98 62.84 84.78 622.20 m 769.82 1.50-2.00m deep 1.13 72.46 97.93 622.20 m 792.59 2.00-2.50m deep 1.23 78.87 106.45 622.20 m 807.52 2.50-3.00m deep 1.30 83.36 112.73 622.20 m 818.29 3.00-3.50m deep 1.50 96.19 130.13 622.20 m 848.52 3.50-4.00m deep 1.82 116.71 158.02 622.20 m 896.93 4.00-4.50m deep 2.35 150.69 204.07 622.20 m 976.96 4.50-5.00m deep 2.80 179.55 243.30 622.20 m 1045.05 5.00-5.50m deep 3.20 205.20 278.15 622.20 m 1105.55 5.50-6.00m deep 3.55 227.64 308.75 622.20 m 1158.59

Extra for bends 0.89 57.07 127.94 6132.75 nr 6317.76

IRON PIPES

Cast iron pipes to BS 437 plain ended pipe with Timesaver mechanical coupling joints; excavation and supports, backfilling 75mm pipes; in trenches, depth

not in trenches 0.12 5.67 0.59 23.43 m 29.69 ne 1.50m deep 0.19 13.79 11.47 23.43 m 48.69 1.50-2.00m deep 0.21 15.24 12.94 23.43 m 51.61 2.00-2.50m deep 0.28 20.32 17.24 23.43 m 60.99 2.50-3.00m deep 0.34 24.67 20.97 23.43 m 69.07 3.00-3.50m deep 0.43 31.20 26.51 23.43 m 81.14 3.50-4.00m deep 0.55 39.91 33.95 23.43 m 97.29 4.00-4.50m deep 0.71 51.52 43.85 23.43 m 118.80 4.50-5.00m deep 0.89 64.58 55.03 23.43 m 143.04 5.00-5.50m deep 1.15 83.45 71.12 23.43 m 178.00

Extra for bend; 87.5° 0.31 22.50 1.82 33.05 nr 57.37 Extra for bend; 45° 0.31 22.50 1.83 33.05 nr 57.38 Extra for single junction; equal 0.48 34.83 3.62 49.76 nr 88.21 Extra for taper reducer 0.27 19.59 1.83 37.93 nr 59.35

hours £ £ £ rate £

100mm pipes; in trenches, depth not in trenches 0.13 6.14 0.25 28.20 m 34.59 ne 1.50m deep 0.21 15.24 12.91 28.20 m 56.35 1.50-2.00m deep 0.23 16.69 14.16 28.20 m 59.05 2.00-2.50m deep 0.30 21.77 18.49 28.20 m 68.46 2.50-3.00m deep 0.37 26.85 22.81 28.20 m 77.86 3.00-3.50m deep 0.48 34.83 29.60 28.20 m 92.63 3.50-4.00m deep 0.60 43.54 37.04 28.20 m 108.78 4.00-4.50m deep 0.75 54.42 46.32 28.20 m 128.94 4.50-5.00m deep 0.95 68.94 58.72 28.20 m 155.86 5.00-5.50m deep 1.22 88.53 75.47 28.20 m 192.20

Extra for bend; 87.5° 0.38 27.57 2.76 41.18 nr 71.51 Extra for bend; 45° 0.38 27.57 2.76 41.18 nr 71.51 Extra for bend; long radius 0.38 27.57 2.76 69.50 nr 99.83 Extra for single junction; equal 0.59 42.81 4.54 102.91 nr 150.26 Extra for double junction; equal 0.80 58.05 7.24 90.03 nr 155.32 Extra for taper reducer 0.40 29.03 4.54 45.11 nr 78.68

150mm pipes; in trenches, depth not in trenches 0.14 6.61 0.25 55.95 m 62.81 ne 1.50m deep 0.24 17.42 14.74 55.95 m 88.11 1.50-2.00m deep 0.28 20.32 17.24 55.95 m 93.51 2.00-2.50m deep 0.34 24.67 20.97 55.95 m 101.59 2.50-3.00m deep 0.40 29.03 24.65 55.95 m 109.63 3.00-3.50m deep 0.54 39.19 33.32 55.95 m 128.46 3.50-4.00m deep 0.61 44.26 37.67 55.95 m 137.88 4.00-4.50m deep 0.79 57.33 48.79 55.95 m 162.07 4.50-5.00m deep 1.05 76.19 64.92 55.95 m 197.06 5.00-5.50m deep 1.32 95.79 81.64 55.95 m 233.38

Extra for bend; 87.5° 0.56 40.64 3.61 78.72 nr 122.97 Ectra for bend; 45° 0.56 40.64 3.61 78.72 nr 122.97 Extra for bend; long radius 0.56 40.64 3.61 179.54 nr 223.79 Extra for single junction; equal 0.88 63.86 7.22 139.76 nr 210.84 Extra for taper reducer 0.56 40.64 7.22 120.57 nr 168.43

225mm pipes; in trenches, depth not in trenches 0.15 7.09 0.25 137.25 m 144.59 ne 1.50m deep 0.25 18.14 15.36 137.25 m 170.75 1.50-2.00m deep 0.30 21.77 18.49 137.25 m 177.51 2.00-2.50m deep 0.35 25.40 21.54 137.25 m 184.19 2.50-3.00m deep 0.41 29.75 25.28 137.25 m 192.28 3.00-3.50m deep 0.54 39.19 33.32 137.25 m 209.76 3.50-4.00m deep 0.61 44.26 37.67 137.25 m 219.18 4.00-4.50m deep 0.77 55.88 47.57 137.25 m 240.70 4.50-5.00m deep 1.02 74.02 63.07 137.25 m 274.34 5.00-5.50m deep 1.30 94.33 80.42 137.25 m 312.00

Extra for bend; 87.5° 0.77 55.88 3.61 338.11 nr 397.60 Extra for bend; 45° 0.77 55.88 3.61 338.11 nr 397.60 Extra for single junction; equal 1.21 87.80 8.13 648.87 nr 744.80 Extra for taper reducer 0.77 55.88 8.13 256.65 nr 320.66

hours £ £ £ rate £

IRON PIPES – cont

Ductile iron pipes to BS 4772, Tyton joints; excavation and supports, backfilling 100mm pipes; in trenches, depth

not in trenches 0.10 4.72 0.25 24.75 m 29.72 ne 1.50m deep 0.19 13.79 11.07 24.75 m 49.61 1.50-2.00m deep 0.20 14.51 12.32 24.75 m 51.58 2.00-2.50m deep 0.26 18.87 16.03 24.75 m 59.65 2.50-3.00m deep 0.32 23.22 19.72 24.75 m 67.69 3.00-3.50m deep 0.42 30.48 25.92 24.75 m 81.15 3.50-4.00m deep 0.53 38.46 32.73 24.75 m 95.94 4.00-4.50m deep 0.66 47.89 40.78 24.75 m 113.42 4.50-5.00m deep 0.84 60.95 51.93 24.75 m 137.63 5.00-5.50m deep 1.08 78.37 66.80 24.75 m 169.92

Extra for bend; 90° 0.38 27.57 17.63 20.31 nr 65.51 Extra for single junction; equal 0.60 43.54 5.43 31.68 nr 80.65

150mm pipes; in trenches, depth not in trenches 0.11 5.20 0.25 48.70 m 54.15 ne 1.50m deep 0.21 15.24 12.91 48.70 m 76.85 1.50-2.00m deep 0.25 18.14 15.40 48.70 m 82.24 2.00-2.50m deep 0.30 21.77 18.49 48.70 m 88.96 2.50-3.00m deep 0.37 26.85 22.81 48.70 m 98.36 3.00-3.50m deep 0.49 35.56 30.23 48.70 m 114.49 3.50-4.00m deep 0.55 39.91 33.95 48.70 m 122.56 4.00-4.50m deep 0.72 52.25 44.47 48.70 m 145.42 4.50-5.00m deep 0.94 68.21 58.12 48.70 m 175.03 5.00-5.50m deep 1.19 86.35 73.59 48.70 m 208.64

Extra for bend; 90° 0.57 41.36 3.61 35.04 nr 80.01 Extra for single junction; equal 0.88 63.86 7.22 73.81 nr 144.89

250mm pipes; in trenches, depth not in trenches 0.16 7.56 0.25 113.24 m 121.05 ne 1.50m deep 0.24 17.42 14.74 113.24 m 145.40 1.50-2.00m deep 0.30 21.77 18.49 113.24 m 153.50 2.00-2.50m deep 0.35 25.40 21.56 113.24 m 160.20 2.50-3.00m deep 0.42 30.48 25.90 113.24 m 169.62 3.00-3.50m deep 0.56 40.64 34.53 113.24 m 188.41 3.50-4.00m deep 0.64 46.44 39.51 113.24 m 199.19 4.00-4.50m deep 0.81 58.78 50.04 113.24 m 222.06 4.50-5.00m deep 1.02 74.02 63.07 113.24 m 250.33 5.00-5.50m deep 1.27 92.16 78.54 113.24 m 283.94

Extra for bend; 90° 0.96 69.66 5.43 193.84 nr 268.93 Extra for single junction; equal 1.32 95.79 9.04 432.33 nr 537.16

400mm pipes; in trenches, depth not in trenches 0.24 11.34 0.54 267.92 m 279.80 ne 1.50m deep 0.33 23.95 20.28 267.92 m 312.15 1.50-2.00m deep 0.43 31.20 26.47 267.92 m 325.59 2.00-2.50m deep 0.48 34.83 29.56 267.92 m 332.31 2.50-3.00m deep 0.57 41.36 35.14 267.92 m 344.42 3.00-3.50m deep 0.71 51.52 43.78 267.92 m 363.22 3.50-4.00m deep 0.91 66.03 56.17 267.92 m 390.12

hours £ £ £ rate £

4.00-4.50m deep 1.16 84.18 71.65 267.92 m 423.75 4.50-5.00m deep 1.47 106.67 90.87 267.92 m 465.46 5.00-5.50m deep 1.77 128.44 109.48 267.92 m 505.84

600mm pipes; in trenches, depth not in trenches 0.34 16.06 0.74 433.60 m 450.40 ne 1.50m deep 0.47 34.11 28.86 433.60 m 496.57 1.50-2.00m deep 0.55 39.91 33.86 433.60 m 507.37 2.00-2.50m deep 0.66 47.89 40.66 433.60 m 522.15 2.50-3.00m deep 0.78 56.60 48.09 433.60 m 538.29 3.00-3.50m deep 0.89 64.58 54.89 433.60 m 553.07 3.50-4.00m deep 1.09 79.10 67.30 433.60 m 580.00 4.00-4.50m deep 1.37 99.41 84.63 433.60 m 617.64 4.50-5.00m deep 1.70 123.36 105.11 433.60 m 662.07 5.00-5.50m deep 2.03 147.31 125.54 433.60 m 706.45

STEEL PIPES

Carbon steel pipes to BS EN 10126; welded joints;(for protection and lining refer to manufacturer); excavation and supports, backfilling 100mm pipes; in trenches, depth

not in trenches 0.07 3.31 0.34 27.24 m 30.89 ne 1.50m deep 0.15 10.88 9.21 27.24 m 47.33 1.50-2.00m deep 0.17 12.34 10.48 27.24 m 50.06 2.00-2.50m deep 0.22 15.96 13.56 27.24 m 56.76 2.50-3.00m deep 0.27 19.59 16.63 27.24 m 63.46 3.00-3.50m deep 0.35 25.40 21.58 27.24 m 74.22 3.50-4.00m deep 0.44 31.93 27.16 27.24 m 86.33 4.00-4.50m deep 0.55 39.91 33.96 27.24 m 101.11 4.50-5.00m deep 0.70 50.80 60.12 27.24 m 138.16 5.00-5.50m deep 0.87 63.13 53.80 27.24 m 144.17

Extra for bend; 45° 0.07 5.08 2.70 44.13 nr 51.91 Extra for bend; 90° 0.07 5.08 2.70 43.62 nr 51.40 Extra for single junction; equal 0.11 7.98 4.52 72.58 nr 85.08

150mm pipes; in trenches, depth not in trenches 0.07 3.31 0.34 40.69 m 44.34 ne 1.50m deep 0.17 12.34 10.45 40.69 m 63.48 1.50-2.00m deep 0.20 14.51 12.32 40.69 m 67.52 2.00-2.50m deep 0.24 17.42 14.78 40.69 m 72.89 2.50-3.00m deep 0.29 21.04 17.88 40.69 m 79.61 3.00-3.50m deep 0.39 28.30 24.04 40.69 m 93.03 3.50-4.00m deep 0.44 31.93 27.16 40.69 m 99.78 4.00-4.50m deep 0.57 41.36 35.22 40.69 m 117.27 4.50-5.00m deep 0.72 52.25 61.83 40.69 m 154.77 5.00-5.50m deep 0.90 65.31 55.68 40.69 m 161.68

Extra for bend; 45° 0.09 6.53 3.61 78.28 nr 88.42 Extra for bend; 90° 0.09 6.53 3.61 76.46 nr 86.60 Extra for single junction; equal 0.16 11.61 7.22 124.96 nr 143.79

hours £ £ £ rate £

STEEL PIPES – cont

Carbon steel pipes to BS EN 10126 – cont 200mm pipes; in trenches, depth

not in trenches 0.09 4.25 8.88 59.33 m 72.46 ne 1.50m deep 0.18 13.06 11.07 59.33 m 83.46 1.50-2.00m deep 0.21 15.24 12.94 59.33 m 87.51 2.00-2.50m deep 0.25 18.14 15.41 59.33 m 92.88 2.50-3.00m deep 0.30 21.77 18.50 59.33 m 99.60 3.00-3.50m deep 0.40 29.03 24.67 59.33 m 113.03 3.50-4.00m deep 0.46 33.38 28.42 59.33 m 121.13 4.00-4.50m deep 0.59 42.81 36.44 59.33 m 138.58 4.50-5.00m deep 0.74 53.70 45.76 59.33 m 158.79 5.00-5.50m deep 0.92 66.76 56.90 59.33 m 182.99

Extra for bend; 45° 0.12 8.71 3.61 111.03 nr 123.35 Extra for bend; 90° 0.12 8.71 3.61 120.01 nr 132.33 Extra for single junction; equal 0.21 15.24 7.17 190.82 nr 213.23

250mm pipes; in trenches, depth not in trenches 0.10 4.72 0.51 84.30 m 89.53 ne 1.50m deep 0.18 13.06 16.26 84.30 m 113.62 1.50-2.00m deep 0.22 15.96 19.29 84.30 m 119.55 2.00-2.50m deep 0.26 18.87 21.66 84.30 m 124.83 2.50-3.00m deep 0.31 22.50 27.15 84.30 m 133.95 3.00-3.50m deep 0.41 29.75 35.93 84.30 m 149.98 3.50-4.00m deep 0.47 34.11 39.94 84.30 m 158.35 4.00-4.50m deep 0.60 43.54 49.42 84.30 m 177.26 4.50-5.00m deep 0.75 54.42 64.39 84.30 m 203.11 5.00-5.50m deep 0.94 68.21 80.73 84.30 m 233.24

Extra for bend; 45° 0.13 9.43 3.61 192.93 nr 205.97 Extra for bend; 90° 0.13 9.43 3.61 197.80 nr 210.84 Extra for single junction; equal 0.23 16.69 7.22 285.82 nr 309.73

300mm pipes; in trenches, depth not in trenches 0.11 5.20 0.54 103.94 m 109.68 ne 1.50m deep 0.20 14.51 12.28 103.94 m 130.73 1.50-2.00m deep 0.25 18.14 15.40 103.94 m 137.48 2.00-2.50m deep 0.28 20.32 17.24 103.94 m 141.50 2.50-3.00m deep 0.34 24.67 20.97 103.94 m 149.58 3.00-3.50m deep 0.44 31.93 27.13 103.94 m 163.00 3.50-4.00m deep 0.53 38.46 32.73 103.94 m 175.13 4.00-4.50m deep 0.68 49.34 42.00 103.94 m 195.28 4.50-5.00m deep 0.86 62.41 53.18 103.94 m 219.53 5.00-5.50m deep 1.06 76.92 65.57 103.94 m 246.43

Extra for bend; 45° 0.14 10.16 5.43 245.13 nr 260.72 Extra for bend; 90° 0.14 10.16 5.43 299.74 nr 315.33 Extra for single junction; equal 0.25 18.14 11.74 384.75 nr 414.63

hours £ £ £ rate £

POLYVINYL CHLORIDE PIPES

Unplasticized pvc perforated pipes; ring seal sockets; excavation and supports, backfilling; 6m pipe lengths unless stated otherwise 82mm pipes; in trench, depth

not in trenches; 3.00m pipe lengths 0.06 2.83 0.14 9.01 m 11.98 ne 1.50m deep; 3.00m pipe lengths 0.10 7.26 4.05 9.01 m 20.32 1.50-2.00m deep 0.13 9.43 5.28 9.01 m 23.72 2.00-2.50m deep 0.16 11.61 6.50 9.01 m 27.12 2.50-3.00m deep 0.19 13.79 7.72 9.01 m 30.52 3.00-3.50m deep 0.22 15.96 8.96 9.01 m 33.93 3.50-4.00m deep 0.25 18.14 10.20 9.01 m 37.35 4.00-4.50m deep 0.28 20.32 11.42 9.01 m 40.75 4.50-5.00m deep 0.32 23.22 13.07 9.01 m 45.30 5.00-5.50m deep 0.35 25.40 14.30 9.01 m 48.71

110mm pipes; in trench, depth not in trenches 0.06 2.83 0.07 12.46 m 15.36 ne 1.50m deep 0.10 7.26 4.05 12.46 m 23.77 1.50-2.00m deep 0.13 9.43 5.28 12.46 m 27.17 2.00-2.50m deep 0.16 11.61 6.50 12.46 m 30.57 2.50-3.00m deep 0.19 13.79 7.72 12.46 m 33.97 3.00-3.50m deep 0.22 15.96 8.96 12.46 m 37.38 3.50-4.00m deep 0.25 18.14 10.20 12.46 m 40.80 4.00-4.50m deep 0.28 20.32 11.42 12.46 m 44.20 4.50-5.00m deep 0.32 23.22 13.07 12.46 m 48.75 5.00-5.50m deep 0.36 26.12 14.72 12.46 m 53.30

160mm pipes; in trench, depth not in trenches 0.06 2.83 0.14 31.91 m 34.88 ne 1.50m deep 0.11 7.98 4.45 31.91 m 44.34 1.50-2.00m deep 0.14 10.16 5.69 31.91 m 47.76 2.00-2.50m deep 0.18 13.06 7.32 31.91 m 52.29 2.50-3.00m deep 0.22 15.96 8.95 31.91 m 56.82 3.00-3.50m deep 0.23 16.69 9.36 31.91 m 57.96 3.50-4.00m deep 0.26 18.87 10.61 31.91 m 61.39 4.00-4.50m deep 0.30 21.77 12.25 31.91 m 65.93 4.50-5.00m deep 0.35 25.40 14.29 31.91 m 71.60 5.00-5.50m deep 0.40 29.03 16.35 31.91 m 77.29

Unplasticized pvc pipes; ring seal sockets; excavation and supports, backfilling; 6m pipe lengths unless stated otherwise 82mm pipes; in trenches, depth

not in trenches; 3.00m pipe lengths 0.06 2.83 0.31 10.60 m 13.74 ne 1.50m deep; 3.00m pipe lengths 0.10 7.26 6.05 10.60 m 23.91 1.50-2.00m deep 0.13 9.43 8.01 10.60 m 28.04 2.00-2.50m deep 0.16 11.61 9.85 10.60 m 32.06 2.50-3.00m deep 0.19 13.79 11.70 10.60 m 36.09 3.00-3.50m deep 0.22 15.96 13.58 10.60 m 40.14 3.50-4.00m deep 0.25 18.14 15.44 10.60 m 44.18

hours £ £ £ rate £

POLYVINYL CHLORIDE PIPES – cont

Unplasticized pvc pipes – cont 82mm pipes – cont

4.00-4.50m deep 0.28 20.32 17.30 10.60 m 48.22 4.50-5.00m deep 0.32 23.22 19.78 10.60 m 53.60 5.00-5.50m deep 0.35 25.40 21.64 10.60 m 57.64

Extra for bend; short radius (socket/spigot) 0.05 3.63 – 28.55 nr 32.18 Extra for branches; equal (socket/spigot) 0.07 5.08 – 36.11 nr 41.19

110mm pipes; in trenches, depth not in trenches 0.06 2.83 0.31 13.88 m 17.02 ne 1.50m deep 0.10 7.26 6.16 13.88 m 27.30 1.50-2.00m deep 0.13 9.43 8.01 13.88 m 31.32 2.00-2.50m deep 0.16 11.61 9.85 13.88 m 35.34 2.50-3.00m deep 0.19 13.79 11.70 13.88 m 39.37 3.00-3.50m deep 0.22 15.96 13.58 13.88 m 43.42 3.50-4.00m deep 0.25 18.14 15.44 13.88 m 47.46 4.00-4.50m deep 0.28 20.32 17.30 13.88 m 51.50 4.50-5.00m deep 0.32 23.22 19.78 13.88 m 56.88 5.00-5.50m deep 0.36 26.12 22.27 13.88 m 62.27

Extra for bend; short redius (socket/spigot) 0.05 3.63 – 43.42 nr 47.05 Extra for bend; adjustable (socket/spigot) 0.05 3.63 – 44.52 nr 48.15 Extra for reducer 0.05 3.63 – 16.00 nr 19.63 Extra for branches; equal (socket/spigot) 0.07 5.08 – 54.90 nr 59.98

160mm pipes; in trenches, depth not in trenches 0.06 2.83 0.31 39.12 m 42.26 ne 1.50m deep 0.11 7.98 6.75 39.12 m 53.85 1.50-2.00m deep 0.14 10.16 8.64 39.12 m 57.92 2.00-2.50m deep 0.18 13.06 11.11 39.12 m 63.29 2.50-3.00m deep 0.22 15.96 13.57 39.12 m 68.65 3.00-3.50m deep 0.23 16.69 14.18 39.12 m 69.99 3.50-4.00m deep 0.26 18.87 16.07 39.12 m 74.06 4.00-4.50m deep 0.30 21.77 18.55 39.12 m 79.44 4.50-5.00m deep 0.35 25.40 21.63 39.12 m 86.15 5.00-5.50m deep 0.40 29.03 24.74 39.12 m 92.89

Extra for bend; short radius (socket/spigot) 0.05 3.63 – 167.80 nr 171.43 Extra for branches; equal (socket/spigot) 0.07 5.08 – 188.39 nr 193.47

225mm pipes; in trenches, depth not in trenches 0.07 3.31 0.34 74.67 m 78.32 ne 1.50m deep 0.12 8.71 7.37 74.67 m 90.75 1.50-2.00m deep 0.15 10.88 9.23 74.67 m 94.78 2.00-2.50m deep 0.20 14.51 12.32 74.67 m 101.50 2.50-3.00m deep 0.23 16.69 14.17 74.67 m 105.53 3.00-3.50m deep 0.24 17.42 14.80 74.67 m 106.89 3.50-4.00m deep 0.27 19.59 16.66 74.67 m 110.92 4.00-4.50m deep 0.32 23.22 19.77 74.67 m 117.66 4.50-5.00m deep 0.36 26.12 22.25 74.67 m 123.04 5.00-5.50m deep 0.45 32.65 27.84 74.67 m 135.16

Extra for bend; short radius 45° (double socket) 0.07 5.08 – 337.28 nr 342.36 Extra for branches; equal (all socket) 0.09 6.53 – 371.45 nr 377.98

hours £ £ £ rate £

300mm pipes; in trenches, depth not in trenches 0.08 3.78 0.40 116.01 m 120.19 ne 1.50m deep 0.13 9.43 7.99 116.01 m 133.43 1.50-2.00m deep 0.16 11.61 9.85 116.01 m 137.47 2.00-2.50m deep 0.21 15.24 12.94 116.01 m 144.19 2.50-3.00m deep 0.23 16.69 14.17 116.01 m 146.87 3.00-3.50m deep 0.25 18.14 15.42 116.01 m 149.57 3.50-4.00m deep 0.28 20.32 17.29 116.01 m 153.62 4.00-4.50m deep 0.34 24.67 21.02 116.01 m 161.70 4.50-5.00m deep 0.38 27.57 23.51 116.01 m 167.09 5.00-5.50m deep 0.47 34.11 29.06 116.01 m 179.18

Extra for bend; short radius 45° (double socket) 0.07 5.08 – 1082.26 nr 1087.34 Extra for branches; unequal (all socket) 0.09 6.53 – 646.60 nr 653.13

Unplasticized pvc pipes; polypropylene couplings; excavation and supports, backfilling; 6m pipe lengths unless stated otherwise 110mm pipes; in trenches, depth

not in trenches 0.06 2.83 0.31 8.89 m 12.03 ne 1.50m deep 0.10 7.26 6.16 8.89 m 22.31 1.50-2.00m deep 0.13 9.43 8.01 8.89 m 26.33 2.00-2.50m deep 0.16 11.61 9.85 8.89 m 30.35 2.50-3.00m deep 0.19 13.79 11.70 8.89 m 34.38 3.00-3.50m deep 0.22 15.96 13.58 8.89 m 38.43 3.50-4.00m deep 0.25 18.14 15.44 8.89 m 42.47 4.00-4.50m deep 0.28 20.32 17.30 8.89 m 46.51 4.50-5.00m deep 0.32 23.22 19.78 8.89 m 51.89 5.00-5.50m deep 0.36 26.12 22.27 8.89 m 57.28

160mm pipes; in trenches, depth not in trenches 0.06 2.83 0.32 29.86 m 33.01 ne 1.50m deep 0.11 7.98 6.75 29.86 m 44.59 1.50-2.00m deep 0.14 10.16 8.64 29.86 m 48.66 2.00-2.50m deep 0.18 13.06 11.11 29.86 m 54.03 2.50-3.00m deep 0.22 15.96 13.57 29.86 m 59.39 3.00-3.50m deep 0.23 16.69 14.18 29.86 m 60.73 3.50-4.00m deep 0.26 18.87 16.07 29.86 m 64.80 4.00-4.50m deep 0.30 21.77 18.55 29.86 m 70.18 4.50-5.00m deep 0.35 25.40 21.63 29.86 m 76.89 5.00-5.50m deep 0.40 29.03 24.74 29.86 m 83.63

225mm pipes; in trenches, depth not in trenches 0.07 3.31 0.34 59.36 m 63.01 ne 1.50m deep 0.12 8.71 7.37 59.36 m 75.44 1.50-2.00m deep 0.15 10.88 9.23 59.36 m 79.47 2.00-2.50m deep 0.20 14.51 12.32 59.36 m 86.19 2.50-3.00m deep 0.23 16.69 14.17 59.36 m 90.22 3.00-3.50m deep 0.24 17.42 14.80 59.36 m 91.58 3.50-4.00m deep 0.27 19.59 16.66 59.36 m 95.61 4.00-4.50m deep 0.32 23.22 19.77 59.36 m 102.35 4.50-5.00m deep 0.36 26.12 22.25 59.36 m 107.73 5.00-5.50m deep 0.45 32.65 27.84 59.36 m 119.85

hours £ £ £ rate £

POLYVINYL CHLORIDE PIPES – cont

Unplasticized pvc pipes – cont 300mm pipes; in trenches, depth

not in trenches 0.08 3.78 0.40 117.49 m 121.67 ne 1.50m deep 0.13 9.43 7.99 117.49 m 134.91 1.50-2.00m deep 0.16 11.61 9.85 117.49 m 138.95 2.00-2.50m deep 0.21 15.24 12.94 117.49 m 145.67 2.50-3.00m deep 0.23 16.69 14.17 117.49 m 148.35 3.00-3.50m deep 0.25 18.14 15.42 117.49 m 151.05 3.50-4.00m deep 0.28 20.32 17.29 117.49 m 155.10 4.00-4.50m deep 0.34 24.67 21.02 117.49 m 163.18 4.50-5.00m deep 0.38 27.57 23.51 117.49 m 168.57 5.00-5.50m deep 0.47 34.11 29.06 117.49 m 180.66

Ultrarib unplasticized pvc pipes; ring seal joints; excavation and supports, backfilling 150mm pipes; in trenches, depth

not in trenches 0.13 6.14 0.65 18.03 m 24.82 ne 1.50m deep 0.16 11.61 9.83 18.03 m 39.47 1.50-2.00m deep 0.19 13.79 11.69 18.03 m 43.51 2.00-2.50m deep 0.22 15.96 13.57 18.03 m 47.56 2.50-3.00m deep 0.24 17.42 14.79 18.03 m 50.24 3.00-3.50m deep 0.24 17.42 14.80 18.03 m 50.25 3.50-4.00m deep 0.27 19.59 16.66 18.03 m 54.28 4.00-4.50m deep 0.32 23.22 19.77 18.03 m 61.02 4.50-5.00m deep 0.36 26.12 22.25 18.03 m 66.40 5.00-5.50m deep 0.45 32.65 27.84 18.03 m 78.52

Extra for 45° bends; short radius (socket/ spigot) 0.05 3.63 – 39.53 nr 43.16 Extra for branches; equal (socket/spigot) 0.09 6.53 – 81.36 nr 87.89

225mm pipes; in trenches, depth not in trenches 0.08 3.78 0.40 43.90 m 48.08 ne 1.50m deep 0.13 9.43 7.99 43.90 m 61.32 1.50-2.00m deep 0.16 11.61 9.85 43.90 m 65.36 2.00-2.50m deep 0.21 15.24 12.94 43.90 m 72.08 2.50-3.00m deep 0.23 16.69 14.17 43.90 m 74.76 3.00-3.50m deep 0.25 18.14 15.42 43.90 m 77.46 3.50-4.00m deep 0.28 20.32 17.29 43.90 m 81.51 4.00-4.50m deep 0.34 24.67 21.02 43.90 m 89.59 4.50-5.00m deep 0.38 27.57 23.51 43.90 m 94.98 5.00-5.50m deep 0.47 34.11 29.06 43.90 m 107.07

Extra for 45° bends; short radius (socket/ spigot) 0.05 3.63 – 166.25 nr 169.88 Extra for branches; equal (socket/spigot) 0.09 6.53 – 238.57 nr 245.10

300mm pipes; in trenches, depth not in trenches 0.08 3.78 0.40 80.55 m 84.73 ne 1.50m deep 0.13 9.43 7.99 80.55 m 97.97 1.50-2.00m deep 0.16 11.61 9.85 80.55 m 102.01

hours £ £ £ rate £

2.00-2.50m deep 0.21 15.24 12.94 80.55 m 108.73 2.50-3.00m deep 0.23 16.69 14.17 80.55 m 111.41 3.00-3.50m deep 0.25 18.14 15.42 80.55 m 114.11 3.50-4.00m deep 0.28 20.32 17.29 80.55 m 118.16 4.00-4.50m deep 0.34 24.67 21.02 80.55 m 126.24 4.50-5.00m deep 0.38 27.57 23.51 80.55 m 131.63 5.00-5.50m deep 0.47 34.11 29.06 80.55 m 143.72

Extra for 45° bends; short radius (socket/ spigot) 0.07 5.08 – 351.76 nr 356.84 Extra for branches; equal (socket/spigot) 0.09 6.53 – 512.82 nr 519.35