Skip to main content
Taylor & Francis Group Logo
    Advanced Search

    Click here to search products using title name,author name and keywords.

    • Login
    • Hi, User  
      • Your Account
      • Logout
      Advanced Search

      Click here to search products using title name,author name and keywords.

      Breadcrumbs Section. Click here to navigate to respective pages.

      Chapter

      LABOUR COSTS
      loading

      Chapter

      LABOUR COSTS

      DOI link for LABOUR COSTS

      LABOUR COSTS book

      LABOUR COSTS

      DOI link for LABOUR COSTS

      LABOUR COSTS book

      ByDavis Langdon & Everest
      BookSpon's Civil Engineering and Highway Works Price Book 2004

      Click here to navigate to parent product.

      Edition 18 Edition
      First Published 2004
      Imprint Spon Press
      Pages 7
      eBook ISBN 9780429181825
      Share
      Share

      ABSTRACT

      Raker, Power roller 4 t+, mechanical spreader operator/leveller

      dry lining

      Certified dry liners

      cranes Cranes with grabs fitted; Crane 3-10 t; Mobile crane/hoist/fork-lift 4-10 t; Overhead/gantry crane<10 t; Power-driven derrick <20 t; Tower crane 2-10 t; Forklift 3 t+

      earthmover transport Dumper 16-60 t scaffolding Scaffolder <2 years scaffolding experience and

      <1 year as Basic Scaffolder piling Rotary or specialist mobile piling rig driver excavation Tractors (wheeled/tracked with/without

      equipment) 100-400 hp; Excavator 0.6-3.85 m3 bucket; Trenching machine (multi bucket) 70 hp +; Motorised scraper; Motor grader

      tunnels Face tunnelling machine concrete Mixer 1500litres+; Mixer, mobile self-loading

      and batching <2500 litres linesmen Linesmen-erectors 1st grade; welding Gas or electric arc welder up to normal

      standards pipes Pipe jointers flexible or lead joints over 535

      mm diameter cranes Mobile cranes/hoists/fork-lifts 5-10 t; Power-

      driven derrick 20 t+, with grab <20 t; Tower crane 10-20 t

      Skilled Operative Rate 1 plant Contractors plant mechanic transport LGV driver; Lorry driver Class C+E licence;

      Dumper 60-125 t excavation Excavator 3.85-7.65 m3; Tractors

      (wheeled/tracked with/without equipment) 400650 hp

      steelwork Steelwork assembly, erection and fixing of steel framed construction

      welding Electric arc welder up to highest standards for structural fabrication+simple pressure vessels (air receivers) including CO2 processes)

      drilling Drilling rig operator; cranes Power-driven derrick with grab 20 t+; Tower

      crane 20 t+

      Craft Operative transport Dumper 125 t+ scaffolding Scaffolder a least 2 years scaffolding

      experience and at least 1 year as Basic and Advanced Scaffolder

      excavation Excavator 7.65 t+(see WR 1.2.2 above); Tractors (wheeled/tracked with/without equipment) 650 hp+

      concrete Reinforcement bender+fixer

      processes on all weldable materials including working on own initiative from drawings

      cranes Crane 10 t+; Mobile cranes/hoists/fork-lifts 10 t+

      T&F logoTaylor & Francis Group logo
      • Policies
        • Privacy Policy
        • Terms & Conditions
        • Cookie Policy
        • Privacy Policy
        • Terms & Conditions
        • Cookie Policy
      • Journals
        • Taylor & Francis Online
        • CogentOA
        • Taylor & Francis Online
        • CogentOA
      • Corporate
        • Taylor & Francis Group
        • Taylor & Francis Group
        • Taylor & Francis Group
        • Taylor & Francis Group
      • Help & Contact
        • Students/Researchers
        • Librarians/Institutions
        • Students/Researchers
        • Librarians/Institutions
      • Connect with us

      Connect with us

      Registered in England & Wales No. 3099067
      5 Howick Place | London | SW1P 1WG © 2022 Informa UK Limited