ABSTRACT

Dump Trucks (not Tippers)

0.75 Piling/Asphalt Equipment

0.65

Tractor Ford 660

9.0 2.0% Rollers BW 90AD

2.0 7.5%

Paver 191 Blaw Knox PF

16.0 5.0% BW 120AD

4.4 7.5%

Compactor plate

188 kg 0.9 3.0% BW6 (towed)

7.6 7.5%

Compressor 3.5 m3/min

5.9 3.0% Dozers CAT D6E

21.0 6.0%

10 m3/min

18.0 3.0% CAT D8N

38.0 3.0%

Tractor mounted

9.0 5.0% Loaders CAT 953B

18.0 4.0%

Mixer 5/3.5 1.2 2.0% Scrapers CAT 621 F

41.5 3.0%

Mobile crane

15 t 5.1 10.0% CAT 657E

130.0 6.0%

Mobile crane

40 t 6.3 10.0% Skidsteer Bobcat 553

3.4 5.0%

Generator 4 kVA 1.6 3.0% Graders CAT 140H

23.0 5.0%

25 kVA 4.9 5.0% Dumpers 2 tonne 3.0 3.0% Backacter 11.5 t 9.5 7.5% Volvo

A25 (ADT)

17.0 3.0%

19 t 14.0 7.5% 36 tonne

25.0 5.0%

30 t 24.0 7.5% Pumps 75 mm 65 m3/hr

1.1 2.0%

Backhoes JCB 3CX, 56 kW

7.5 6.0% 150 mm 360 m3/hr

4.2 3.0%

PLANT PLANT COSTS The costs included in this section are based upon the methodology of the worked examples, these have then been compared to average costs, allowances and hire rates in force at the time of writing (Summer 2003). These costs then form the basis for plant costs included in parts 4 and 5 (except for specialist advice). Weekly costs are based upon a 40 hour week, daily costs are based on an 8 hour day, all costs are exclusive of labour for operation. Also given here is a reference to the November 2002 CECA Daywork Schedule (Plant Section). Rates given for consumables are in line with the notes on the preceding page without loss or wastage and are based on the following (All plant except those noted are priced on Gas Oil usage): Petrol 4 star 70.10 pence/litre Petrol Unleaded 70.41 pence/litre Fuel Oil (taxed for use in licensed vehicles) DERV

65.21 pence/litre

Fuel Oil (untaxed, for use on site) Gas Oil

18.46 pence/litre

Lubrication Oil (15/40) 103.95 pence/litre Mains electric power 9.66 pence/kWh Oxygen £38.74 /10 m3 0.21 pence/litre Acetylene £64.00 /8.4 m3 0.76 pence/litre Propane 121.34 pence/kg Also included here are allowances for Transmission Oils, Hydraulic Oil, Filters, Grease, etc. N/A indicates that information not available. Imperial units of measurements are used frequently in this section reflecting their continuing usage in this sector of the industry. Cost per working week DSR

Hire Rate

£ Hire

Period Plant

£ Usage

% Fuel l/hr

Oil etc. %

fuel Total

£

ACCESS PLATFORMS

Access platform, scissor type, towed; height of platform 5 m

4.00 hour 4.00 – – – 4.00 1(8)

scissor type, electric; height of platform 5 m

Access platform, scissor type, rough terrain, petrol driven; height of platform 8 m

7.92 hour 7.92 50 1.5 2.0 8.46 1(6)

Access platform, telescopic, towed; height of platform 12 m

6.23 hour 6.23 – – – 6.23 1(13)

Access platform telescopic, petrol; height of platform 14 m

7.59 hour 7.59 50 2.0 3.0 8.32 1(11)

£ ACCESS PLATFORMS

Access platform, telescopic, vehiclemounted (DERV)

height of platform 12 m

16.22 hour 16.22 50 2.0 3.0 16.89 1(16)

height of platform 15 m

16.97 hour 16.97 50 3.0 3.0 17.98 1(*)

Access platform underbridge type (Simon Gala topper)

26.39 hour 26.39 – – – 26.39 1(13)

AGRICULTURAL TYPE

4WD (74 KW)

Ford 5000 (68 HP) c/w 1T Hiab lift

12.43 hour 12.43 75 9.0 2.0 13.70 32(62)

Ford 5000 (68 HP) with front end loading bucket (0.33 m3)

11.81 hour 11.81 75 9.0 2.0 13.08 37(51)

Ford 5000 (68 HP) with Hydro seedingequipment

12.56 hour 12.56 75 9.0 2.0 13.83 37(*)

Ford 5000 (68 HP) includes 2 tool compressor and front end loading bucket

12.91 hour 12.91 75 10.5 3.5 14.41 –

Ford 5000 with Fencing Auger

11.74 hour 11.74 75 9.0 3.5 13.03 –

ASPHALT/ROAD CONSTRUCTION

Asphalt pavers maximum paving width 3.60 m, 24 kW engine

20.97 hour 20.97 80 6.2 4.0 21.92 2(1)

extending up to 4 m, 35 kW engine

37.71 hour 37.71 80 8.2 5.0 38.98 2(1)

maximum paving width 9 m, 80 kW engine

68.37 hour 68.37 80 17.0 3.0 70.96 2(3)

Associated equipment

tar sprayer (100 litre)

1.42 hour 1.42 80 9.0 3.0 2.79 29(6)

self propelled chip spreader

5.55 hour 5.55 80 9.0 3.0 6.92 2(9)

heating iron 1.02 hour 1.02 – – – 1.02 – insulated (20 tonne) tipper (DERV)

18.11 hour 18.11 80 14.0 7.0 25.92 14(18)

Aveling Barford 3 point roller

6.76 hour 6.76 80 6.0 7.5 7.71 23(4)

Surface planers, cold plane

planing width 0.5 m, 72 kW

10.40 hour 10.40 80 6.0 5.0 11.33 2(12)

planing width 2.1 m, 390 kW

43.33 hour 43.33 80 12.0 5.0 45.19 2(14)

ASPHALT/ROAD CONSTRUCTION

Surface planers, heat plane planing width up to 1.0 m re-mixer

20.80 hour 20.80 80 8.0 3.0 22.02 2(11)

planing width up to 4.5 m remixer

64.13 hour 64.13 80 13.0 5.0 66.15 2(−)

Concrete pavers maximum paving width 6.00 m, depth 300 mm, 123 KW

60.66 hour 60.66 80 17.0 3.0 63.25 –

maximum paving width 12.8 m depth 500 mm 340 kW

88.39 hour 88.39 80 72.0 3.0 99.34 –

Concrete Slipform paver/trimmer

maximum paving width 5 m

72.80 hour 72.80 80 24.0 3.0 76.45 –

Slipformed Concrete joint and bar inserter

8.67 hour 8.67 80 4.0 3.0 9.28 –

Concrete Slipform finisher 13.09 hour 13.09 80 9.0 3.0 14.46 – COMPACTION Plate compactors Vibrating compaction plate 64 kg unit weight 360 mm wide (petrol)

40.02 week 1.00 85 0.8 3.0 1.49 22(6)

Vibrating compaction plate 140 kgunit weight 400 mm wide (petrol)

45.63 week 1.14 85 1.2 3.0 1.88 22(8)

Vibrating compaction plate 180 kg unit weight 600 mm wide

43.87 week 1.10 85 0.9 3.0 1.25 22(10)

Vibrating compaction plate 345 kg unit weight 600 mm wide

47.38 week 1.18 85 1.2 3.0 1.37 22(12)

Vibrating compaction trench plate 300 mm wide

35.95 week 0.90 85 0.8 3.0 1.03 22(*)

Tamper BT58 62 kg (petrol)

40.02 week 1.00 85 0.8 3.0 1.49 22(1)

CLEANERS/SWEEPERS Front Tractor or Truck mounted

Towed sweeper diesel engined

92.30 week 2.31 75 4.0 4.0 4.34 –

Glutton type mobile gully sucker

11.94 hour 11.94 75 12.0 3.0 17.98 –

£ MOBILE COMPRESSORS (SILENCED OR SUPER SILENCED)

Compressors, single tool

1.80 m3/min, 13 kW

99.84 week 2.50 85 3.2 4.0 3.02 4(1)

Compressors, two tool

2.80 m3/min, 23 kW, two tool

113.43 week 2.84 85 4.5 3.0 3.57 4(2)

3.70 m3/min, 28 kW, two tool

134.05 week 3.35 85 5.9 3.0 4.30 4(3)

4.80 m3/min, 34 kW, two tool

155.12 week 3.88 85 6.8 3.0 4.98 4(4)

7.30 m3/min, 53 kW, two tool

201.88 week 5.05 85 10.2 3.0 6.70 4(6)

Compressors, four tool

11.30 m3/min, 95 kW, four tool

327.55 week 8.19 85 19.0 3.0 11.26 4(8)

15.50 m3/min, 160 kW, four tool

363.95 week 9.10 85 32.0 3.0 14.27 4(9)

16.00 m3/min, 160 kW, four tool

412.47 week 10.31 85 32.0 3.0 15.48 4(9)

18.40 m3/min, 235 kW, four tool

355.29 week 8.88 85 47.0 3.0 16.48 4(10)

kW, four tool

25.30 m3/min, 216 kW

519.93 week 13.00 85 43.0 3.0 19.95 4(11)

Reciprocating compressors

up to 4 cfm for small air tools 240 v

37.02 week 0.93 85 3.0 3.0 1.41 4(16)

up to 9 cfm for small air tools 240 v

66.29 week 1.66 85 3.0 3.0 2.14 4(16)

up to 13 cfm for small air tools 240 v

73.09 week 1.83 85 4.0 3.0 2.48 4(16)

Petrol driven hydraulic power unit c/w breaker (63 kg)

63.18 week 1.58 85 1.5 3.0 1.82 –

Metreater self propelled hydraulic asphalt cutter

98.26 week 2.46 75 9.0 3.0 3.74 –

Vehicle compressor Compair Holman 4 m3/min on Ford Transit B or C series chassis

8.76 hour 8.76 85 12.0 3.0 10.70 4(15)

Bristol MF-4 on International Tractor

9.13 hour 9.13 85 12.0 3.0 11.07 4(*)

Bristol MF-4 on International Tractor with loading bucket

10.24 hour 10.24 85 12.0 3.0 12.18 4(*)

£ COMPRESSOR TOOLS (cw 50 ft/15 5 m HOSE)

chipping hammer, 0.7 m3/min

30.33 week 0.76 – – – 0.76 30(4)

brick hammer/demolition pick, 1.4 m3/min

11.26 week 0.28 – – – 0.28 –

clay spade, 1.6 m3/min

14.73 week 0.37 – – – 0.37 30(3)

road breaker, 2.4 m3/min

27.98 week 0.70 – – – 0.70 30(1)

hand hammer drill, 0.9 m3/min

32.12 week 0.80 – – – 0.80 30(*)

light rock drill 28, 1.2 m3/min

38.45 week 0.96 – – – 0.96 30(5)

medium rock drill 30, 1.5 m3/min

52.99 week 1.32 – – – 1.32 30(6)

heavy rock drill 33, 2.4 m3/min

70.52 week 1.76 – – – 1.76 30(7)

scabbler 1 head hand, 0.3 m3/min

64.41 week 1.61 – – – 1.61 –

scabbler 3 head hand, 0.7 m3/min

77.27 week 1.93 – – – 1.93 –

scabbler 5 head trolley, 3.1 m3/min

170.45 week 4.26 – – – 4.26 –

scabbler 7 head trolley, 4.5 m3/min

200.04 week 5.00 – – – 5.00 –

needle gun/descaler, 0.3 m3/min

41.06 week 1.03 – – – 1.03 30(4)

concrete crack cutter, 0.7 m3/min

91.12 week 2.28 – – – 2.28 –

rammer, 1.5 m3/min

14.99 week 0.37 – – – 0.37 22(1)

air lance, variable valve, 0.3 m3/min

14.47 week 0.36 – – – 0.36 –

impact wrench 12 mm drive, 0.4 m3/min

33.83 week 0.85 – – – 0.85 –

impact wrench 25 mm drive, 0.4 m3/min

56.95 week 1.42 – – – 1.42 –

steel post driver (crash barrier), 2.4 m3/min

73.92 week 1.85 – – – 1.85 –

angle grinder 9″, 0.8 m3/min

38.78 week 0.97 – – – 0.97 –

disc cutter 12″, 1.4 m3/min

48.38 week 1.21 – – – 1.21 –

poker vibrator P35 (35 mm), 2.4 m3/min

35.60 week 0.89 – – – 0.89 6(24)

poker vibrator P54 (54 mm), 2.4 m3/min

45.00 week 1.13 – – – 1.13 6(24)

poker vibrator P70 (70 mm), 2.4 m3/min

52.38 week 1.31 – – – 1.31 6(24)

rotary drill, 0.3 m3/min

35.60 week 0.89 – – – 0.89 –

extra 50 ft/15 m hose

9.10 week 0.23 – – – 0.23 –

CONCRETE EQUIPMENT

Poker vibrators air pokers (see compressor tables)

6(24)

50 mm, petrol 41.70 week 1.04 75 2.0 2.0 2.11 6(21) 50 mm, electric

41.70 week 1.04 – – – 1.04 6(23)

75 mm, diesel 41.70 week 1.04 75 1.5 2.0 1.25 6(22) 75 mm, electric

42.48 week 1.06 – – – 1.06 6(23)

Tampers and screeders

vibrating tamper and handles (petrol)

59.32 week 1.48 75 2.0 2.0 2.55 6(32)

razor-back 37.07 week 0.93 75 1.5 2.0 1.14 –

double beam screeder (7.6 m wide)

82.32 week 2.06 75 1.5 2.0 2.27 6(34)

Rotary power float (petrol),

687 mm diameter

42.48 week 1.06 75 2.0 2.0 2.13 6(36)

865 mm diameter

51.26 week 1.28 75 2.0 2.0 2.35 6(36)

Reinforcement power bar cropper (electric)

67.46 week 1.69 – – – 1.69 3(6)

Reinforcement power bar bender (electric)

83.45 week 2.09 – – – 2.09 3(3)

Compaction stud roller 14.03 week 0.35 75 1.5 2.0 0.56 – MIXERS Concrete mixer

3/2 tip up, 240 v

30.55 week 0.76 – – – 0.76 5(1)

4/3, petrol 33.89 week 0.85 75 1.5 2.0 1.65 5(1) 5/3½, diesel 51.37 week 1.28 75 1.2 2.0 1.45 5(2) 8½/6, diesel, skip fed

65.03 week 1.63 75 1.3 2.0 1.81 5(6)

Paddle screed mixer 5/3½ diesel

37.35 week 0.93 75 1.2 2.0 1.10 5(13)

Truck mixer (Rite mixer) 6 m3

26.41 hour 26.41 75 14.0 3.0 28.41 5(40)

mixer: 75 5.5 2.0 0.78 CONCRETE PUMPS

Air operated ‘SEM’ pump

5.90 hour 5.90 – – – 5.90 6(1)

Truck mounted 45 cm/hr (air pump)

27.69 hour 27.69 75 8.0 3.0 28.83 6(6)

Schwing KSP5 slurry pump

9.92 hour 9.92 75 1.5 3.0 10.13 6(1)

CONCRETE SKIPS

Rollover type 0.5 yd3 (0.38 m3) 21.00 week 0.53 – – – 0.53 8(22) Dual flow type 0.5 yd3 (0.38 m3) 23.25 week 0.58 – – – 0.58 8(22) 0.75 yd3 (0.57 m3)

27.47 week 0.69 – – – 0.69 8(23)

1.00 yd3 (0.76 m3)

31.24 week 0.78 – – – 0.78 8(24)

CRANES 7 t mobile (site use)

14.31 hour 14.31 60 3.4 10.0 14.72 7(2)

Truck mounted mobile (wheeled) cranes

15 t SWL 24.99 hour 24.99 60 5.1 10.0 25.61 7(20) 20 t SWL 30.02 hour 30.02 60 5.5 10.0 30.69 7(20) 25 t SWL 37.93 hour 37.93 60 5.8 10.0 38.64 7(21) 40 t SWL 54.21 hour 54.21 60 6.3 10.0 54.98 7(23) 50 t SWL 72.46 hour 72.46 60 8.5 10.0 73.50 7(24) Truck mounted mobile (wheeled) cranes

70 t SWL 102.17 hour 102.17 60 10.0 10.0 103.39 7(25) 90 t SWL 108.16 hour 108.16 60 12.0 10.0 109.62 7(25) Crawler cranes 10 t (22RB) 20.13 hour 20.13 60 3.0 10.0 20.50 7(12) 20 t (30RB) 18.39 hour 18.39 60 3.5 10.0 18.82 7(12) 30 t (NCK Pennine)

23.96 hour 23.96 60 3.5 10.0 24.39 7(13)

DIESEL GENERATORS

500 w Petrol 110 or 240V

41.74 week 1.04 85 0.8 3.0 1.53 11(1)

1.5 kVA Petrol 110 or 240 V

52.13 week 1.30 85 1.1 3.0 1.98 11(1)

2.5 kVA Petrol 110 or 240 V

62.08 week 1.55 85 1.7 3.0 2.59 11(2)

4 kVA diesel dual voltage

74.12 week 1.85 85 1.6 3.0 2.11 11(2)

7.5 kVA diesel dual voltage

109.34 week 2.73 85 1.8 3.0 3.02 11(3)

7.5 kVA diesel (super silenced)

112.31 week 2.81 85 1.8 3.0 3.10 11(3)

10 kVA diesel dual voltage

137.57 week 3.44 85 2.1 4.0 3.78 11(3)

15 kVA diesel dual voltage

171.97 week 4.30 85 3.0 4.0 4.79 11(4)

25 kVA diesel 3 phase 440 V

216.19 week 5.40 85 4.9 5.0 6.21 11(5)

55 kVA diesel 3 phase 440 V

260.42 week 6.51 85 10.9 5.0 8.31 11(7)

75 kVA diesel 3 phase 440 V

304.02 week 7.60 85 17.0 5.0 10.40 11(8)

DIESEL GENERATORS

125 kVA diesel 3 phase 440 V

435.32 week 10.88 85 21.8 5.0 14.47 11(11)

200 kVA diesel 3 phase 440 V

591.39 week 14.78 85 40.0 5.0 21.37 11(12)

250 kVA diesel 3 phase 440 V

762.56 week 19.06 85 48.0 5.0 26.97 11(13)

EXCAVATORS (Bucket capacity refers to SAE heaped)

Rope operated, crawler mounted dragline equipment

R-B Lincoln 22RB HD, 27.6 t, 1.15 m3, 56 kW

29.59 hour 29.59 75 9.0 7.5 30.93 10(4)

R-B Lincoln 5160, 65.3 t, 2.0 m3, 172 kW

68.54 hour 68.54 75 20.0 7.5 71.52 10(7)

R-B Lincoln 61 RB HD, 93.2 t, 3.0 m3, 194 kW

97.92 hour 97.92 75 32.0 7.5 102.68 100

Kubota KX36, 1435 kg (0.04 m3)

310.20 week 7.76 85 4.0 5.0 8.42 10(15)

Kubota KX41, 1565 kg (0.045 m3)

310.20 week 7.76 85 4.0 5.0 8.42 10(15)

Kubota KX71, 2835 kg (0.075 m3)

409.46 week 10.24 85 5.0 5.0 11.06 10(16)

Smalley SMC 529, 2820 kg (0.12 m3)

409.46 week 10.24 85 5.0 5.0 11.06 10(16)

Hitachi EX15, 1440 kg (0.05 m3)

303.88 week 7.60 85 4.0 5.0 8.26 10(15)

Thwaites all dig 2740 kg (0.25 m3)

376.00 week 9.40 85 5.0 5.0 10.22 10(16)

Mini Excavators (wheeled)

Komatsu PW30, 3000 kg

355.29 week 8.88 85 5.0 5.0 9.70 10(15)

Hydraulic crawler mounted backacter approximate data:

weight up to

SAE bucket

kW

3.5 tonne

0.10 m3

25 11.18 hour 11.18 80 4.0 7.5 11.82 10(17)

6.5 tonne

0.25 m3

40 11.86 hour 11.86 80 5.0 7.5 12.65 10(19)

8.5 tonne

0.30 m3

50 12.46 hour 12.46 80 8.0 7.5 13.73 10(19)

11.5 tonne

0.40 m3

63 13.69 hour 13.69 80 9.5 7.5 15.20 10(20)

14.5 tonne

0.45 m3

70 15.79 hour 15.79 80 10.5 7.5 17.46 10(21)

16 tonne

0.55 m3

80 17.94 hour 17.94 80 12.0 7.5 19.85 10(21)

19 tonne

0.70 m3

90 21.93 hour 21.93 80 14.0 7.5 24.15 10(22)

21 tonne

1.00 m3

100 24.06 hour 24.06 80 16.0 7.5 26.60 10(22)

23.5 tonne

1.00 m3

115 27.79 hour 27.79 80 19.0 7.5 30.81 10(23)

£ EXCAVATORS Hydraulic crawler mounted backacter; approximate data:

weight up to

SAE bucket

kW

28.5 tonne

1.20 m3

130 32.12 hour 32.12 75 24.0 7.5 35.69 10(24)

35.5 tonne

1.20 m3

160 60.75 hour 60.75 75 31.0 7.5 65.36 10(25)

40 tonne

1.60 m3

180 61.61 hour 61.61 75 36.0 7.5 66.97 10(26)

50 tonne

2.00 m3

205 66.82 hour 66.82 75 45.0 7.5 73.52 10(26)

60 tonne

2.50 m3

235 80.43 hour 80.43 75 52.0 7.5 88.17 10(27)

20 tonne (0.6 m3) Priestman VC15 15 m reach, cable operated

29.88 hour 29.88 80 16.0 7.5 32.42 10(22)

30 tonne (0.8 m3) Priestman VC20 20 m reach, cable operated

52.07 hour 52.07 75 24.0 7.5 55.64 10(24)

Hydraulic wheeled backacter

weight up to

SAE bucket

3.5 tonne

0.10 m3 10.48 hour 10.48 80 4.0 7.5 11.12 10(17)

6.5 tonne

0.27 m3 12.32 hour 12.32 80 5.0 7.5 13.11 10(19)

8 tonne

0.34 m3 13.74 hour 13.74 80 8.0 7.5 15.01 10(19)

11 tonne

0.43 m3 12.61 hour 12.61 80 9.5 7.5 14.12 10(19)

15 tonne

0.47 m3 17.91 hour 17.91 80 10.5 7.5 19.58 10(21)

19 tonne

1.00 m3 21.68 hour 21.68 80 14.0 7.5 23.90 10(22)

JCB 3CX, 0.9 m3 13.12 hour 13.12 75 7.5 6.0 14.22 10(36) MF 750, 0.95 m3 12.83 hour 12.83 75 7.5 6.0 13.93 10(36) Case 580G, 0.96 m3

12.26 hour 12.26 75 7.5 6.0 13.36 10(37)

Cat 416, 0.76 m3 10.45 hour 10.45 75 7.5 6.0 11.55 10(35) Cat 428, 1.00 m3 12.39 hour 12.39 75 7.5 6.0 13.49 10(36) Ford 555, 0.86 m3

12.83 hour 12.83 75 7.5 6.0 13.93 10(36)

Hymac 180C, 0.95 m3

13.12 hour 13.12 75 7.5 6.0 14.22 10(36)

Percussion breaker attachments

BRH91 (142 kg) with steels

127.61 week 3.19 – – – 3.19 10(30)

BRH125 (310 kg) with steels

180.07 week 4.50 – – – 4.50 10(30)

HB501 (1000 kg) with steels

269.40 week 6.74 – – – 6.74 10(31)

Krupp HM 1500 (2100 kg) with

steels 360.14 week 9.00 – – – 9.00 10(34)

£ EXCAVATORS Other hydraulic attachments

Rock backacter bucket (ripper teeth)

99.26 week 2.48 – – – 2.48 –

Ditch bucket (c/w side cutters)

66.63 week 1.67 – – – 1.67 –

Trapezoidal bucket

73.72 week 1.84 – – – 1.84 –

Clamshell Grab (1.0 m3)

133.28 week 3.33 – – – 3.33 –

Rock handling Grab (up to 3 t)

124.76 week 3.12 – – – 3.12 –

Scrap handling Grab (up to 1 t)

124.76 week 3.12 – – – 3.12 –

bucket

Demolition ball 24.10 week 0.60 – – – 0.60 – Large scoop bucket 1.40 m3

59.55 week 1.49 – – – 1.49 –

Single shank ripper

31.19 week 0.78 – – – 0.78 –

Flat track shoes (highway use)

17.01 week 0.43 – – – 0.43 –

HOISTS, LIFTING AND HANDLING

Telescopic handler 4WD lifting up to 2.50 tonnes (load all 525)

9.13 hour 9.13 – 75.0 4.0 9.13 15(12)

Electric forklift 2.5 tonnes

3.52 hour 3.52 – – – 3.52

Rough terrain forklift (Liner Giraffe) 5.6 tonnes

11.02 hour 11.02 75 7.5 4.0 12.10 15(20)

Lorry (8T) with 1T Hiab

16.50 hour 16.50 75 7.5 4.0 17.58 14(10)

1200 kg Tower platform hoist

197.66 week 4.94 75 3.0 3.0 5.37 –

Mast section per 1.5 m (max×91 m)

7.02 week 0.18 – – – 0.18 –

HOISTS, LIFTING AND HANDLING

Tirfor winch TU 32 (3T SWL)

35.10 week 0.88 – – – 0.88 36(14)

Tirfor winch TU 16

25.27 week 0.63 – – – 0.63 36(12)

Chain hoist up to 2000 kg capacity

23.73 week 0.59 – – – 0.59 –

Chain hoist up to 3000 kg capacity

25.27 week 0.63 – – – 0.63 –

Electric cable hoist 200 kg SWL with gantry

51.94 week 1.30 – – – 1.30 36(6)

Engine crane up to 10 CWT (500 kg SWL)

23.52 week 0.59 75 2.0 3.0 0.88 36(1)

PILING PLANT (weight=piston weight) Piling hammer, double acting (air)

weight up to 2,500 kg

721.56 week 18.04 – – – 18.04 17(5)

weight up to 3,500 kg

913.32 week 22.83 – – – 22.83 17(6)

weight up to 4,500 kg

1,020.57 week 25.51 – – – 25.51 17(7)

Piling hammer, double acting hydraulic

weight up to 5,000 kg

350.95 week 8.77 – – – 8.77 –

weight up to 10,000 kg

379.03 week 9.48 – – – 9.48 –

weight up to 50,000 kg

526.44 week 13.16 – – – 13.16 –

weight up to 100,000 kg

1,094.97 week 27.37 – – – 27.37 –

Piling hammer, single acting diesel

weight up to 1,500 kg

568.31 week 14.21 75 6.0 5.0 15.08 17(30)

weight up to 2,500 kg

914.28 week 22.86 75 11.0 5.0 24.46 17(32)

weight up to 3,500 kg

1,382.19 week 34.55 75 14.0 5.0 36.59 17(34)

weight up to 5,000 kg

1,502.55 week 37.56 75 16.0 5.0 39.89 –

weight up to 5,700 kg

1,596.41 week 39.91 75 18.0 5.0 42.53 17(35)

weight up to 6,200 kg

2,171.45 week 54.29 75 26.0 5.0 58.07 17(36)

weight up to 7,500 kg

2,526.85 week 63.17 75 30.0 5.0 67.53 17(37)

weight up to 8,800 kg

2,773.24 week 69.33 75 35.0 5.0 74.42 17(38)

hammers

length 8.5 m 231.60 week 5.79 – – – 5.79 17(*) length 15.5 m 396.41 week 9.91 – – – 9.91 17(53) length 22.5 m 455.10 week 11.38 – – – 11.38 17(54) Flexible hose for compressed air (per 30 ft length)

38 mm diameter 21.05 week 0.53 – – – 0.53 17(24) 50 mm diameter 26.67 week 0.67 – – – 0.67 17(25) Piling extractors (including compressor)

BSP HD10 unit weight 3,000 kg

1,165.13 week 29.13 75 20.0 4.0 32.01 17(20)

BSP HD15 unit rate 4,580 kg

1,359.49 week 33.99 75 30.0 4.0 38.31 17(21)

Vibratory hammer/extractor, hydraulic

cent. force-16 tonne, pulling force −12.5 tonne

1,374.77 week 34.37 75 30.0 7.5 38.84 17(39)

cent. force-59 tonne, pulling force −36 tonne

3,099.28 week 77.48 75 30.0 7.5 81.95 17(41)

cent. force-200 tonne, pulling force −80 tonne

10,123.24 week 253.08 75 30.0 7.5 257.55 17(43)

ROLLERS Pedestrian rollers

475 kg trench compactor

2.04 hour 2.04 80 0.9 7.5 2.18 23(11)

600 kg double drum vibratory

2.97 hour 2.97 80 1.0 7.5 3.13 23(11)

928 kg 3.31 hour 3.31 80 1.6 7.5 3.56 23(12)

vibratory 1300 kg double drum vibratory

3.64 hour 3.64 80 2.3 7.5 4.01 23(13)

159 kg single drum vibratory

1.96 hour 1.96 80 0.8 7.5 2.09 23(9)

466 kg single drum vibratory

2.04 hour 2.04 80 0.9 7.5 2.18 23(9)

Self propelled rollers

2½ tonne double vibratory

6.24 hour 6.24 80 3.6 7.5 6.82 23(21)

5 tonne double vibratory

8.43 hour 8.43 80 3.8 7.5 9.04 23(22)

Self propelled rollers

9 tonne single drum vibratory

12.81 hour 12.81 80 10.0 7.5 14.40 23(23)

Bomag BW172D single drum vibratory

13.55 hour 13.55 80 11.0 7.5 15.30 23(25)

Bomag BW212D single drum vibratory

14.48 hour 14.48 80 16.3 7.5 17.07 23(26)

Bomag BW217D single drum vibratory

20.90 hour 20.90 80 23.8 7.5 24.67 23(*)

Bomag BC601RB Refuse compactor

17.50 hour 17.50 80 42.0 7.5 24.17 23(*)

3 wheel dead weight

Hamm HW90-10

8.93 hour 8.93 80 16.0 7.5 11.47 23(3)

DC13-10 tonne

Aveling DC15-12 tonne

8.93 hour 8.93 80 17.0 7.5 11.63 23(4)

Rubber tyred rollers

9 wheel Dynapac CP27 10 tonne

11.78 hour 11.78 80 17.0 7.5 14.48 23(7)

7 wheel Dynapac CP22 6 tonne

11.41 hour 11.41 80 12.0 7.5 13.32 23(6)

Towed vibratory rollers

Bomag BW6 (6 tonne)

6.24 hour 6.24 80 7.5 7.5 7.43 23(17)

Bomag BW6S Sheepsfoot

6.57 hour 6.57 80 4.0 7.5 7.21 23(30)

Dual Purpose Rollers

Benford MBR71B with breaker

2.53 hour 2.53 80 4.0 7.5 3.17 –

Bomag BW75 EHB with breaker

2.88 hour 2.88 80 4.0 7.5 3.52 –

SCAFFOLDING AND

Cost per working week

metre

Tube galvanised per metre

0.38 4 week 0.10 – – – 0.10 25(1)

Boards-per 4 metre length

0.52 4 week 0.13 – – – 0.13 25(19)

Base plates adjustable each

0.38 4 week 0.10 – – – 0.10 25(8)

Base plates fixed each

0.17 4 week 0.04 – – – 0.04 25(7)

Clips each (all types)

0.17 4 week 0.04 – – – 0.04 25(7)

Couplers each (all types)

0.17 4 week 0.04 – – – 0.04 25(7)

Cost per working hour Spigots each ledgers and braces/m

0.17 4 week 0.04 – – – 0.04 25(7)

Putlog 1.5 m blade end each steel

0.27 4 week 0.07 – – – 0.07 25(3)

Putlog 1.8 m blade end each steel

0.27 4 week 0.07 – – – 0.07 25(5)

Reveal screws each

0.07 4 week 0.02 – – – 0.02 25(7)

Castor wheel nylon tyred

2.42 4 week 0.61 – – – 0.61 25(16)

ACCESS STAGING AND TOWERS

Alloy towers base size 1.8×0.80 height to platform 2.6 m

33.83 week 33.83 – – – 33.83 –

Extra sections per 2 m rise (max 3)

20.10 week 20.10 – – – 20.10 –

Alloy towers base size 1.8×1.80 height to platform 2.6 m

38.31 week 38.31 – – – 38.31 –

Extra sections per 2 m rise (max 7)

23.51 week 23.51 – – – 23.51 –

Alloy stairwell tower per 2 m rise

28.30 week 28.30 – – – 28.30 –

Steel towers base size 1.80×1.80

17.37 week 17.37 – – – 17.37 –

Extra sections per 0.60 m rise

4.43 week 4.43 – – – 4.43 –

Steel towers base size 3.80×3.80 height to platform 1.80 m

30.46 week 30.46 – – – 30.46 –

Extra sections per 1.20 m rise

10.36 week 10.36 – – – 10.36 –

Castor wheels 2.08 4 week 0.52 – – – 0.52 25(14) Toe boards per 4 metre length

0.27 4 week 0.07 – – – 0.07 25(19)

Toe boards hinged per 4 metre length

0.32 4 week 0.08 – – – 0.08 –

Handrail (included with towers)

0.19 4 week 0.05 – – – 0.05 –

Stair tread complete

0.28 4 week 0.07 – – – 0.07 –

Brick guard 0.95 4 week 0.24 – – – 0.24 – Bridging Unit per 1.00 m

3.25 week 3.25 – – – 3.25 –

£ TRACTORS Tractor dozers with single equipment

50 kW Cat D3C

11.65 hour 11.65 80 11.0 7.5 13.40 32(1)

74 kW Cat D4H

16.81 hour 16.81 80 14.5 7.5 19.11 32(2)

104 kW Cat D6E

29.27 hour 29.27 80 21.0 6.0 32.56 32(4)

212 kW Cat D8N

69.39 hour 69.39 80 38.0 6.0 75.34 32(7)

276 kW Cat 80.35 hour 80.35 80 53.0 7.5 88.76 32(9)

LGP

123 kW D6H LGP

30.24 hour 30.24 80 25.0 7.5 34.21 32(5)

Dozer attachments

single shank ripper

3.09 hour 3.09 – – – 3.09 –

triple shank ripper

5.62 hour 5.62 – – – 5.62 –

‘U’ dozer blade

1.68 hour 1.68 – – – 1.68 –

angle dozer blade

1.75 hour 1.75 – – – 1.75 –

skeleton blade

1.75 hour 1.75 – – – 1.75 –

Tractor loaders

0.8 m3 Cat 931C

15.03 hour 15.03 75 11.0 7.5 16.67 32(11)

1.5 m3 Cat 953

23.31 hour 23.31 75 19.0 7.5 26.14 32(15)

2.0 m3 Cat 963

39.71 hour 39.71 75 25.0 7.5 43.43 32(16)

3.0 m3 Cat 973

50.85 hour 50.85 75 34.0 7.5 55.91 32(18)

3.0 m3 Cat 973 LGP

51.12 hour 51.12 75 34.0 7.5 56.18 32(18)

Wheeled loaders

0.55 m3 33 kW

9.74 hour 9.74 75 8.0 7.5 10.93 32(28)

0.75 m3 41 kW

11.51 hour 11.51 75 9.5 7.5 12.92 32(28)

1.50 m3 83 kW

23.47 hour 23.47 75 11.0 7.5 25.11 32(32)

2.10 m3 115 kW

27.85 hour 27.85 75 19.0 7.5 30.68 32(36)

2.60 m3 135kW

41.35 hour 41.35 75 23.0 7.5 44.77 32(37)

3.50 m3 194 kW

55.04 hour 55.04 80 30.0 7.5 59.80 32(39)

5.40 m3 310 kW

116.55 hour 116.55 80 53.0 7.5 124.96 32(41)

Wheeled loaders

10.50 m3 588 79.43 hour 79.43 80 90.0 7.5 93.72 32(*)

loader; 1.00 m3, 54 kW

Wheel dozer, blade capacity 7.5 m3 338 kW

43.92 hour 43.92 80 68.0 7.5 54.72 32(9)

Loader Attachments

4 in 1 bucket 2.40 hour 2.40 – – – 2.40 – side dumping bucket

2.12 hour 2.12 – – – 2.12 –

rock bucket 1.82 hour 1.82 – – – 1.82 – skeleton bucket

1.89 hour 1.89 – – – 1.89 –

TRACTORS single shank ripper (D6)

3.09 hour 3.09 – – – 3.09 –

multi shank ripper (D8)

5.62 hour 5.62 – – – 5.62 –

rear mounted backacter

8.00 hour 8.00 – – – 8.00 –

Hydraulic face shovels

32 tonne, 1.50 m3

49.36 hour 49.36 80 34.0 7.5 54.76 10(25)

42 tonne, 2.60 m3

67.11 hour 67.11 80 44.0 7.5 74.10 10(26)

62 tonne, 1.30-3.40 m3

79.24 hour 79.24 80 64.0 7.5 89.40 10(27)

Skid Steer Loaders

Bobcat 443 5.68 hour 5.68 75 3.5 5.0 6.19 32(48) Bobcat 543 6.47 hour 6.47 75 4.5 5.0 7.12 32(49) Bobcat 645 7.43 hour 7.43 75 8.3 5.0 8.64 32(49) Motor Scrapersingle engine

Cat 621E-62.51 hour 62.51 80 44.0 3.0 69.20 32(69)

33.60 m3

Motor Scrapertwin engine

Cat 627E16.00 m3

73.78 hour 73.78 80 70.0 3.0 84.43 32(71)

Cat 657E (Push Pull)– 33.60 m3

162.52 hour 162.52 80 125.5 6.0 182.17 32(73)

Motor scraperelevating

Cat 613C8.40 m3

45.06 hour 45.06 80 25.0 3.0 48.86 32(74)

Cat 61513.00 m3

53.46 hour 53.46 80 36.0 3.0 58.94 32(75)

Cat 623E16.80 m3

60.72 hour 60.72 80 46.0 3.0 67.72 32(76)

Tractor (tracked) pipe layer complete with counterweight and boom

up to 145 kW lifting max 28 t (Komatsu D65EX12/CAT 57G)

35.89 hour 35.89 80 17.0 4.0 38.50 –

Tractor (tracked) pipe layer complete with counterweight and boom

up to 149 kW lifting max 41 t (CAT 572G)

42.20 hour 42.20 80 17.0 4.0 44.81 –

up to 224 kW, lifting max 70 t (CAT 578)

51.57 hour 51.57 80 26.0 4.0 55.56 –

Tractor (tracked) no equipment, for Agro/towing use

125 kW 18.96 hour 18.96 75 18.0 5.0 21.58 –

£ TRACTORS Motor Grader (6 wheel)

up to 93 kW blade 3.66 m (Cat 120G)

16.71 hour 16.71 80 17.0 7.5 19.41 32(55)

up to 113 kW blade 3.66 m (Cat 140G)

35.03 hour 35.03 80 23.0 7.5 38.68 32(56)

up to 158 KW blade 3.96 m

27.20 hour 27.20 80 27.0 7.5 31.49 32(57)

up to 205 kW blade 4.88 m (Cat 16G)

36.09 hour 36.09 80 32.0 7.5 41.17 33(*)

Trench excavator (Trencher)

up to 100 kW max width 0.60 m maxdepth 2.40 m (Vermeer T65E)

47.16 hour 47.16 75 22.0 3.0 50.30 33(5)

up to 230 kW max width 1.07 m maxdepth 3.66 m (Vermeer T850)

71.99 hour 71.99 75 40.0 3.0 77.69 33(7)

towed type from Agro Tractor maxwidth 0.13 m max depth 0.55 m

7.63 hour 7.63 75 3.0 3.0 8.06 33(*)

DUMPERS)

Tipping lorries

4×2 wheel tippers

gross weight up to 8.5 tonnes payloadup to 5.5 tonnesside tipping

9.90 hour 9.90 80 30.0 4.0 14.51 14(15/19

gross weight up to 11 tonnes payloadup to 8 tonnes

12.08 hour 12.08 80 25.0 4.0 15.92 14(15)

gross weight up to 14 tonnes payloadup to 10 tonnes

12.56 hour 12.56 80 30.0 4.0 17.17 14(16)

gross weight up to 17 tonnes payloadup to 12 tonnes

13.34 hour 13.34 80 33.0 4.0 18.41 14(16)

6×4 wheel tippers

gross weight up to 24 tonnes payload up to 18 tonnes

21.48 hour 21.48 80 35.0 4.0 26.86 14(17)

gross weight up to 26 tonnes payload up to 20 tonnes

23.88 hour 23.88 80 40.0 4.0 30.02 14(18)

8×4 wheel tippers

gross weight up to 27 tonnes payload up to 20 tonnes

26.17 hour 26.17 80 40.0 4.0 32.31 14(18)

gross weight up to 30 tonnes

27.97 hour 27.97 80 42.0 4.0 34.42 14(18)

gross weight up to 33 tonnes payload up to 24 tonnes

30.36 hour 30.36 80 44.0 4.0 37.12 14(*)

TRANSPORT (TIPPERS AND DUMPERS)

Articulated tipper trailers (Highway type excluding tractor)

twin axle (Bogie) payload up to 20 tonnes (40′ length)

16.60 hour 16.60 80 40.0 4.0 22.74 –

triple axle (Bogie) payload up to 25 tonnes (50′ length)

23.88 hour 23.88 80 44.0 4.0 30.64 –

Dump truck (on site use only)

10.5 m3 heaped capacity, 15.5 tonne payload

12.22 hour 12.22 80 15.0 5.0 14.55 9(13)

14 m3 heaped capacity, 18 tonne payload (KOMATSU HP 180-4)

17.54 hour 17.54 80 31.0 5.0 22.35 9(15)

only)

19 m3 heaped capacity, 31 tonne payload (TEREX 33-05B)

31.88 hour 31.88 80 37.5 5.0 37.69 9(18)

24 m3 heaped capacity, 36 tonne payload (CAT 769C)

48.31 hour 48.31 80 37.9 5.0 54.19 9(18)

57 m3 heaped capacity, 88 tonne payload (KOMATSU HD 785-3)

63.41 hour 63.41 80 112.0 5.0 80.78 9(*)

78 m3 heaped capacity, 136 tonne payload (CAT 785D)

74.48 hour 74.48 80 122.0 5.0 93.40 90

Dump truck (articulated type ADT’s)

Volvo A20 6×6, 18.5 tonne pay load 11 m3 heaped capacity

17.54 hour 17.54 80 21.4 3.0 20.80 9(23)

Volvo A25C 6×6, 22.5 tonne payload 12 m3 heaped capacity

28.83 hour 28.83 80 29.2 3.0 33.27 9(24)

Dump truck (articulated type ADT’s)

Terex 2566B, 23 tonne

29.12 hour 29.12 80 26.9 3.0 33.21 9(24)

capacity Moxy MT27, 25 tonne payload 13.6 m3 heaped capacity

29.12 hour 29.12 80 29.5 3.0 33.61 9(25)

Caterpillar D250D, 25 tonne payload 14.2 m3 heaped capacity

29.12 hour 29.12 80 25.0 3.0 32.92 9(25)

Volvo A35 6×6, 32 tonne pay load 19 m3 heaped capacity

40.48 hour 40.48 80 36.5 3.0 46.03 9(26)

TRANSPORT (TIPPERS AND DUMPERS)

Small dumpers

750 kg payload, heaped capacity 0.55 m3 (Thwaites Sprite 4×2)

1.75 hour 1.75 80 1.5 3.0 1.98 9(3)

1000 kg payload, heaped capacity 0.75 m3 (Thwaites Nimline

1.89 hour 1.89 80 2.0 3.0 2.19 9(3)

payload, heaped capacity 1.55 m3 (Thwaites Alldrive 4000, 4×4)

2500 kg payload, heaped capacity 1.80 m3 (Thwaites Alldrive 6000, 4×4)

3.52 hour 3.52 80 4.0 3.0 4.13 9(6)

3000 kg payload, heaped capacity 2.00 m3 (Thwaites Alldrive 7000, 4×4)

4.21 hour 4.21 80 5.0 3.0 4.97 9(7)

4000 kg payload, heaped capacity 2.50 m3 (Thwaites Alldrive 4 t, 4×4)

5.06 hour 5.06 80 7.0 3.0 6.12 9(8)

Power barrow

2.74 hour 2.74 80 0.8 2.0 2.86 9(49)

Transport (trucks and vans)

Ford transit 5 t chassis

5.62 hour 5.62 80 7.0 3.0 6.68

Leyland road runner 8 t chassis

6.88 hour 6.88 80 8.0 3.0 8.10

Ford cargo

8.71 hour 8.71 80 10.0 3.0 10.23

Mercedes 1617 16 t chassis

10.24 hour 10.24 80 15.0 3.0 12.52

Skip Loader Ford 1713 17 t chassis

15.30 hour 15.30 80 15.0 3.0 17.58

Escort 55 van (petrol)

5.13 hour 5.13 80 8.0 3.0 6.35 14(20)

P100 pick up (DERV) (1.10 tonnes)

5.63 hour 5.63 80 8.0 3.0 6.85 14(21)

Personnel carrier (12 seat transit)

5.70 hour 5.70 80 10.0 3.0 7.22 14(30)

SWB Land Rover (DERV)

6.88 hour 6.88 80 7.0 3.0 7.94 14(26)

LWB Land Rover (DERV)

8.76 hour 8.76 80 7.0 3.0 9.82 14(27)

Trailers Flat trailer (2 axles)

35.10 4 week 0.22 – – – 0.22 –

Drop side trailer (2 axles)

42.11 4 week 0.26 – – – 0.26 –

Plant Trailer up to 10 ton

66.83 4 week 0.42 – – – 0.42 –

Plant Trailer up to 20 ton

95.47 4 week 0.60 – – – 0.60 –

TRENCH SHEETS ETC. (MINIMUM 50)

Trench struts (each)

Nr 0; range 0.30 m-0.40 m

0.34 week 0.34 – – – 0.34 –

Nr 1; range 0.48 m-0.70 m

0.36 week 0.36 – – – 0.36 26(3)

Nr 2; range 0.71 m-1.12 m

0.38 week 0.38 – – – 0.38 26(4)

Nr 3; range 1.02 m-1.73 m

0.45 week 0.45 – – – 0.45 26(5)

Standard props (each)

Nr 0 3 ft 6in-6 ft 0in

0.34 week 0.34 – – – 0.34 26(13)

Nr 1 5 ft 9 in-10 ft 3 in

0.41 week 0.41 – – – 0.41 26(14)

Nr 2 6 ft 6 in-11 ft 0in

0.50 week 0.50 – – – 0.50 26(15)

Nr 3 8 ft 6 in-13 ft 0in

0.56 week 0.56 – – – 0.56 –

Nr 4 10 ft 6 in16 ft 0 in

0.62 week 0.62 – – – 0.62 –

Nr 5 16 ft 0 in21 ft 0 in

0.85 week 0.85 – – – 0.85 –

Beam heads (each)

Nr 1 0.41 week 0.41 – – – 0.41 – Nr 2 0.49 week 0.49 – – – 0.49 – Nr 3 0.62 week 0.62 – – – 0.62 – Nr 4 0.72 week 0.72 – – – 0.72 – Split heads (each)

Nr 1 1 ft 9 in-2 ft 9 in

0.56 week 0.56 – – – 0.56 –

Nr 2 3 ft 9 in-4 ft 6 in

0.62 week 0.62 – – – 0.62 –

Nr 3 4 ft 6 in-6 ft 3 in

0.78 week 0.78 – – – 0.78 –

Trench Sheets 6′0″ 0.99 week 0.99 – – – 0.99 –

12′0″ 1.75 week 1.75 – – – 1.75 – 14′0″ 1.96 week 1.96 – – – 1.96 – 16′0″ 2.25 week 2.25 – – – 2.25 – Trench boxes (approximate cost per m2)— refer to Approximate Estimates

PUMPING AND DEWATERING

Self priming centrifugal diesel pumps (inc. 8 m suction and delivery pipes)

50 mm 550 l/min 45.04 week 1.13 80 0.8 2.0 1.25 20(10) 75 mm Flygt submersible 1050 l/min (4 kW)

34.75 week 0.87 80 – – 0.87 20(24)

75 mm 750 l/min 59.52 week 1.49 80 1.0 2.0 1.64 20(11)

PUMPING AND DEWATERING

100 mm 1500 l/min 85.63 week 2.14 80 2.8 2.0 2.56 20(12) 150 mm Sykes UV5 head pump/ high capacity

148.67 week 3.72 80 6.8 2.0 4.74 20(13)

76 mm Sykes VCD3 jetting pump

176.87 week 4.42 80 2.0 2.0 4.72 –

100 mm Sykes WP100/60 wellpointing pump

163.12 week 4.08 80 4.5 2.0 4.76 –

150 mm Sykes WP150/60 wellpointing pump

201.45 week 5.04 80 6.8 2.0 6.06 –

Extra hose (per metre)

50 mm Suction 1.27 week 0.03 – – – 0.03 21(2) 50 mm Delivery 0.91 week 0.02 – – – 0.02 21(8) 75 mm Suction 1.40 week 0.04 – – – 0.04 21(3)

100 mm Delivery 1.34 week 0.03 – – – 0.03 21(10) 150 mm Suction 2.66 week 0.07 – – – 0.07 21(5) 150 mm Delivery 2.60 week 0.07 – – – 0.07 21(11) 150 mm Duraline (lay flat fine hose)

– week – – – –

150 mm Jetting tube – week

(included with Jetting

Pump) – – – – 150 mm PVC header pipe and

attachments at 1.50 m centres

including jet wells for wellpointing

to 6.5 m deep (per well-point)

3.22 week 0.08 – – – 0.08 –

MISCELLANEOUS Road form 10 m long (each)

100 mm high 2.94 week 0.07 – – – 0.07 27(2) 125 mm high 3.09 week 0.08 – – – 0.08 – 150 mm high 3.30 week 0.08 – – – 0.08 27(3) 200 mm high 3.52 week 0.09 – – – 0.09 27(4) 225 mm high 3.72 week 0.09 – – – 0.09 27(7) Flexible road form 3 m long (each)

150 mm high 1.40 week 0.04 – – – 0.04 – 200 mm high 1.47 week 0.04 – – – 0.04 – 225 mm high 1.54 week 0.04 – – – 0.04 –

£ MISCELLANEOUS Road signs on stands (each)

600 mm diameter 6.74 week 0.17 – – – 0.17 37(43) 780 mm diameter 6.74 week 0.17 – – – 0.17 37(44) 900 mm diameter 8.43 week 0.21 – – – 0.21 37(45) 1200 mm diameter 9.83 week 0.25 – – – 0.25 – Road safety flashing hazard lamps (Batteries inc.)

1.47 week 0.04 – – – 0.04 37(22)

road pins 0.56 week 0.01 – – – 0.01 – PVC-U barrier 3.94 week 0.10 – – – 0.10 37(6) cone converter 1.40 week 0.04 – – – 0.04 – railway sleepersbaulks-each

2.12 week 0.05 – – – 0.05 –

traffic light systems two way radar, 110V 98.26 week 2.46 – – – 2.46 – two way, mains, timer operated

84.23 week 2.11 – – – 2.11 37(9)

Transformers/cables 2 kVA 8.43 week 0.21 – – – 0.21 11(16) 4 kVA 15.44 week 0.39 – – – 0.39 11(17) 6 kVA 24.58 week 0.61 – – – 0.61 11(18) Extension cable 240V/110V

15 m plug and socket 4.49 week 0.11 – – – 0.11 – 30 m plug and socket 5.62 week 0.14 – – – 0.14 – 15 m 4 mm 7.75 week 0.19 – – – 0.19 – Transformers/cables 240V junction box 8.10 week 0.20 – – – 0.20 – 110V junction box 8.10 week 0.20 – – – 0.20 – Welding & cutting sets

ARC Mains 140 amps portable

19.65 week 0.49 – – – 0.49 35(5)

ARC Petrol 200 amps mobile

65.12 week 1.63 80 1.8 – 2.64 –

ARC Diesel 300 amps trailer mounted

84.23 week 2.11 80 2.3 – 2.45 35(3)

Oxy acetylene set portable (cutting)

42.11 week 1.05 75 650/325 – 3.93 35(1)

Oxy acetylene set portable (welding)

47.59 week 1.19 75 500/325 – 4.07 35(2)

MIG welder 120 amp 25.98 week 0.65 – – – 0.65 –

MISCELLANEOUS Lighting 0.76 Gas floodlight 6′ 14.03 week 0.35 – – – 0.35 –

(cw 2kVA generator)

40′ floodlight tower (cw 6 kVA generator)

112.31 week 2.81 – – – 2.81 –

Festoon lighting set (34 m)

18.25 week 0.46 – – – 0.46 –

Tripod floodlight 1.8 m stand 500 watt

17.97 week 0.45 – – – 0.45 –

Drain tools drain rods (10 m set) including equipment

9.47 week 0.24 – – – 0.24 37(24)

drain plug (rubber diaphragm) 100

3.37 week 0.08 – – – 0.08 37(26)

drain plug (rubber diaphragm) 150

4.21 week 0.11 – – – 0.11 37(27)

drain plug (rubber diaphragm) 300

4.49 week 0.11 – – – 0.11 37(28)

mains powered drain cleaner

50.54 week 1.26 – – – 1.26 –

drain tester-smoke 6.74 week 0.17 – – – 0.17 – drain tester-U gauge

7.58 week 0.19 – – – 0.19 –

drain testerpressure pump

22.46 week 0.56 – – – 0.56 –

drain tester-mandrel 4.21 week 0.11 – – – 0.11 – stilson wrench 24 5.84 week 0.15 – – – 0.15 – stilson wrench 36″ 8.98 week 0.22 – – – 0.22 – clay pipe cutter to 9″ 16.84 week 0.42 – – – 0.42 – steel pipe cutter to 6″ 12.77 week 0.32 – – – 0.32 – drain bag 4″ or 6″ 5.62 week 0.14 – – – 0.14 – Tar boilers lorry mounted <400 litres

12.93 hour 12.93 – – – 12.93 29(1)

power operated <1200 litres

35.10 week 0.88 – – – 0.88 29(2)

Shot blasting equipment

150 lb 92.66 week 2.32 – – – 2.32 – 350 lb 128.09 week 3.20 – – – 3.20 – Grit blaster ICE 160, 72 kg

103.32 week 2.58 – – – 2.58 –

Stone splitter 25″×4″ 42.53 week 1.06 – – – 1.06 – Block splitter 22.46 week 0.56 – – – 0.56 – Slab splitter 28.08 week 0.70 – – – 0.70 – Slab lifter 5.90 week 0.15 – – – 0.15 –

MISCELLANEOUS Cartridge guns

Hilti DX650 25.27 week 0.63 – – – 0.63 – Hilti DX450 22.46 week 0.56 – – – 0.56 – Heating/Drying Propane radiant heater (12,500 BTU)

12.64 week 0.32 80 0.3 – 0.56 37(11)

forced air heater (60,000 BTU)

36.50 week 0.91 80 1.2 – 2.07 37(12)

forced air heater (150,000 BTU)

50.54 week 1.26 80 3.0 – 4.17 37(14)

forced air heater (325,000 BTU)

72.97 week 1.82 80 6.5 – 8.13 37(16)

dehumidifier (40 litres/day)

44.92 week 1.12 – – – 1.12 37(34)

fume extractor (6″ diameter)

49.13 week 1.23 – – – 1.23 –

Drills/Saws/Tools diamond drill, 6″ max. diameter

73.55 week 1.84 – – – 1.84 –

masonry drill & core bits, 10 mm

23.59 week 0.59 – – – 0.59 –

masonry drill & core bits, 32 mm

45.20 week 1.13 – – – 1.13 31(1)

angle head drill 14.03 week 0.35 – – – 0.35 31(4) Roto broach, milling to 34 mm

50.76 week 1.27 – – – 1.27 –

rotary hammer drill, light weight

23.59 week 0.59 – – – 0.59 31(15)

rotary hammer drill, heavy weight

20.78 week 0.52 – – – 0.52 31(16)

demolition hammer, heavy duty

22.46 week 0.56 – – – 0.56 –

grinder, 225 mm, electric

16.84 week 0.42 – – – 0.42 –

grinder, 114 mm, electric

12.36 week 0.31 – – – 0.31 31(11)

saw bench, 410 mm diameter, petrol

39.31 week 0.98 75 1.0 2.0 1.52 24(10)

saw bench, 610 mm diameter, diesel

42.11 week 1.05 75 1.0 2.0 1.19 24(13)

225 mm electric grinder (angle)

21.33 week 0.53 – – – 0.53 31(10)

450 mm conc saw 25hp diesel

98.26 week 2.46 75 0.3 2.0 2.50 6(41)

600 mm conc saw 40hp diesel

116.65 week 2.92 75 0.3 2.0 2.96 6(42)

Stihl saw disc 305 mm petrol

30.89 week 0.77 75 0.2 2.0 0.88 37(18)

Drills/Saws/Tools Stihl saw disc 12″ air 28.79 week 0.72 – – – 0.72 37(18) 8″ floor sander (electric)

38.76 week 0.97 – – – 0.97 31(13)

Water/Fuel Supply towed (trailer) water/diesel

bowser, 275 gallon 21.05 week 0.53 – – – 0.53 34(8) bowser, 500 gallon 38.61 week 0.97 – – – 0.97 34(9) lorry-mounted tanker, 1000 gallon

(DERV) 8.5 t chassis 11.16 hour 11.16 75 9.0 2.0 15.65 34(10)

MISCELLANEOUS lorry-mounted tanker, 1500 gallon (DERV) 12t chassis

13.18 hour 13.18 75 13.0 2.0 19.67 34(11)

storage tanks, up to 250 gallon

32.29 4 week 0.20 – – – 0.20 34(1)

storage tanks, up to 500 gallon

40.70 4 week 0.25 – – – 0.25 34(2)

up to 1000 gallon 50.54 4 week 0.32 – – – 0.32 34(3) up to 2000 gallon 56.15 4 week 0.35 – – – 0.35 34(4) Landscaping Items and Tools

post hole auger 6″/9″ hand

8.56 week 0.21 – – – 0.21 –

powered auger petrol 56.15 week 1.40 75 2.0 2.0 2.47 – post driver for 4″ post

7.02 week 0.18 – – – 0.18 –

post driver for 6″ 7.72 week 0.19 – – – 0.19 –

4″ wide

bolt croppers 24″ or 36″

9.83 week 0.25 – – – 0.25

tipping and loading skip 6 tonne

33.69 week 0.84 – – – 0.84 8(13)

cultivator self propelled

123.53 week 3.09 75 1.0 2.0 3.23 –

Boilers and Sprays bitumen boiler 10 gallon (45 litres)

22.46 week 0.56 75 1.0 2.0 1.10 –

bitumen boiler 15 gallon (68 litres)

39.99 week 1.00 75 1.0 2.0 1.54 –

cold tar spray 39.99 week 1.00 – – – 1.00 – Flame gun propane (road burner)

12.36 week 0.31 75 N/a N/a 0.31 2(15)

Air tool bitslandscaping (see also compressor tools)

shove holer 8.08 week 0.20 – – – 0.20 – points and chisels 1.34 week 0.03 – – – 0.03 – clayspade 1.82 week 0.05 – – – 0.05 30(3) tarmac cutter 3.15 week 0.08 – – – 0.08 – comb holder 1.40 week 0.04 – – – 0.04 – self-drill anchor holder

1.82 week 0.05 – – – 0.05 –

rammer foot 2.66 week 0.07 – – – 0.07 – Floor sander (belt) 23.86 week 0.60 – – – 0.60 31(13) Pinking roller 14.03 week 0.35 – – – 0.35 – Floor grinder/scarifier, electric

53.34 week 1.33 – – – 1.33 –

Floor saw, 450 mm petrol

70.19 week 1.75 75 1.0 2.0 2.29 6(38)

Floor plane, petrol 63.18 week 1.58 75 1.0 2.0 2.12 – Floor scaler, petrol 77.21 week 1.93 75 1.0 2.0 2.47 – Rubbish chute (sections)

4.49 week 0.11 – – – 0.11 –

Diesel elevators up to 15 m 56.15 week 1.40 75 3.0 2.0 1.82 – up to 30 m 77.21 week 1.93 75 5.0 2.0 2.64 –

FORMWORK EQUIPMENT

Adjustable props Nr 0 1.07-1.82 2.60 week 2.60 – – – 2.60 Nr 1 1.75-3.12 2.60 week 2.60 – – – 2.60 Nr 2 1.98-3.35 3.03 week 3.03 – – – 3.03 Nr 3 2.59-3.95 3.03 week 3.03 – – – 3.03 Nr 4 3.20-4.88 3.03 week 3.03 – – – 3.03 MISCELLANEOUS Decking per SM (Kwikstage)

(excluding props) 3.47 week 3.47 – – – 3.47 Column clamps (set) Nr 1 0.3-0.53 0.91 week 0.91 – – – 0.91 27(17) Nr 2 0.46-0.84 1.06 week 1.06 – – – 1.06 27(18) Nr 3 0.66-1.222 1.19 week 1.19 – – – 1.19 27(19) Beam Clamps 300 mm arms 1.13 week 1.13 – – – 1.13 27(20) 450 mm arms 1.23 week 1.23 – – – 1.23 27(21) 600 mm arms 1.40 week 1.40 – – – 1.40 27(22) Manhole shutters1800 mm high

675 mm internal diameter

30.89 week 30.89 – – – 30.89

900 mm internal diameter

38.61 week 38.61 – – – 38.61

1050 mm internal diameter

40.70 week 40.70 – – – 40.70

1200 mm internal diameter

44.23 week 44.23 – – – 44.23

1500 mm internal diameter

47.04 week 47.04 – – – 47.04

1800 mm internal diameter

56.15 week 56.15 – – – 56.15

2100 mm internal diameter

63.52 week 63.52 – – – 63.52

2400 mm internal diameter

67.24 week 67.24 – – – 67.24

2700 mm internal diameter

75.74 week 75.74 – – – 75.74

Portable

fittings but excluding additional security items, shutters, grilles etc. per unit delivered and set up on site)

Offices Jack Leg hutment 12′2″×8′8″

22.53 week 22.53 – – – 22.53 16(1)

Jack Leg hutment 16′2″×8′8″

27.73 week 27.73 – – – 27.73 16(1)

Jack Leg hutment 24′2″×10′2′

34.66 week 34.66 – – – 34.66 16(1)

Jack Leg hutment 32′2″×10′2′

46.80 week 46.80 – – – 46.80 16(1)

£ MISCELLANEOUS Jack Leg hutment 48′2″×12′2′

60.66 week 60.66 – – – 60.66 16(1)

Wheeled cabin 12′1″×7′6

16.84 week 16.84 – – – 16.84 16(6)

Wheeled cabin 22′1″×7′6

33.69 week 33.69 – – – 33.69 16(7)

Stores Jack Leg hutment 12′2″×8′8″

13.86 week 13.86 – – – 13.86 16(1)

Jack Leg hutment 16′2″×8′8″

15.60 week 15.60 – – – 15.60 16(1)

Jack Leg hutment 24′2″×10′2′

19.07 week 19.07 – – – 19.07 16(1)

Jack Leg hutment 32′2″×10′2′

29.47 week 29.47 – – – 29.47 16(1)

Sundries Toilet, chemical 17.33 week 17.33 – – – 17.33 16(5) Toilet unit, water flushing

24.26 week 24.26 – – – 24.26 16(5)

Toilet unit, VIP, water flushing

45.06 week 45.06 – – – 45.06 16(5)

Pollution Decontamination unit

62.39 week 62.39 – – – 62.39 16(5)

32′4″×8′8″