Skip to main content
Taylor & Francis Group Logo
    Advanced Search

    Click here to search products using title name,author name and keywords.

    • Login
    • Hi, User  
      • Your Account
      • Logout
      Advanced Search

      Click here to search products using title name,author name and keywords.

      Breadcrumbs Section. Click here to navigate to respective pages.

      Chapter

      CLASS M: STRUCTURAL METALWORK
      loading

      Chapter

      CLASS M: STRUCTURAL METALWORK

      DOI link for CLASS M: STRUCTURAL METALWORK

      CLASS M: STRUCTURAL METALWORK book

      CLASS M: STRUCTURAL METALWORK

      DOI link for CLASS M: STRUCTURAL METALWORK

      CLASS M: STRUCTURAL METALWORK book

      ByDavis Langdon & Everest
      BookSpon's Civil Engineering and Highway Works Price Book 2004

      Click here to navigate to parent product.

      Edition 18 Edition
      First Published 2004
      Imprint Spon Press
      Pages 3
      eBook ISBN 9780429181825
      Share
      Share

      ABSTRACT

      Portal frames straight on plan – – – – t 1040.09 Trestles, towers and built-up columns

      straight on plan – – – – t 1334.78 Trusses and built-up girders

      straight on plan – – – – t 1334.78 curved on plan – – – – t 1820.17 Bracings angles; straight on plan

      – – – – t 895.64

      circular hollow sections; straight on plan

      – – – – t 1877.95

      Purlins and cladding rails

      straight on plan – – – – t 1040.09 Cold rolled purlins and rails

      straight on plan – – – – t 1820.17 Anchorages and holding down bolt assemblies

      base plate and bolt assemblies complete

      – – – – t 2111.63

      ERECTION OF FABRICATED MEMBERS ON SITE

      Trial erection – – – – t 250.38 Permanent erection

      – – – – t 190.76

      Site bolts black − – – – t 2479.41 HSFG general grade

      – – – – t 2479.41

      indicating or limit types, general grade

      HSFG load indicating or limit types, higher grade

      – – – – t 3660.08

      OFF SITE SURFACE TREATMENT

      Note: The following preparation and painting systems have been calculated on the basis of 20 m2 per tonne

      Blast cleaning – – – – m23.21 Galvanising – – – – m211.18 Painting one coat zinc chromate primer

      – – – – m21.57

      one coat two pack epoxy zinc phosphate primer (75 microns dry film thickness)

      – – – – m25.41

      two coats epoxy micaceous iron oxide (100 microns dry film thickness per coat)

      – – – – m213.80

      T&F logoTaylor & Francis Group logo
      • Policies
        • Privacy Policy
        • Terms & Conditions
        • Cookie Policy
        • Privacy Policy
        • Terms & Conditions
        • Cookie Policy
      • Journals
        • Taylor & Francis Online
        • CogentOA
        • Taylor & Francis Online
        • CogentOA
      • Corporate
        • Taylor & Francis Group
        • Taylor & Francis Group
        • Taylor & Francis Group
        • Taylor & Francis Group
      • Help & Contact
        • Students/Researchers
        • Librarians/Institutions
        • Students/Researchers
        • Librarians/Institutions
      • Connect with us

      Connect with us

      Registered in England & Wales No. 3099067
      5 Howick Place | London | SW1P 1WG © 2022 Informa UK Limited