Skip to main content
Taylor & Francis Group Logo
    Advanced Search

    Click here to search products using title name,author name and keywords.

    • Login
    • Hi, User  
      • Your Account
      • Logout
      Advanced Search

      Click here to search products using title name,author name and keywords.

      Breadcrumbs Section. Click here to navigate to respective pages.

      Chapter

      SERIES 1400: ELECTRICAL WORK FOR ROAD LIGHTING AND TRAFFIC SIGNS
      loading

      Chapter

      SERIES 1400: ELECTRICAL WORK FOR ROAD LIGHTING AND TRAFFIC SIGNS

      DOI link for SERIES 1400: ELECTRICAL WORK FOR ROAD LIGHTING AND TRAFFIC SIGNS

      SERIES 1400: ELECTRICAL WORK FOR ROAD LIGHTING AND TRAFFIC SIGNS book

      SERIES 1400: ELECTRICAL WORK FOR ROAD LIGHTING AND TRAFFIC SIGNS

      DOI link for SERIES 1400: ELECTRICAL WORK FOR ROAD LIGHTING AND TRAFFIC SIGNS

      SERIES 1400: ELECTRICAL WORK FOR ROAD LIGHTING AND TRAFFIC SIGNS book

      ByDavis Langdon & Everest
      BookSpon's Civil Engineering and Highway Works Price Book 2004

      Click here to navigate to parent product.

      Edition 18 Edition
      First Published 2004
      Imprint Spon Press
      Pages 6
      eBook ISBN 9780429181825
      Share
      Share

      ABSTRACT

      Trenching gang 1 ganger/chargehand (skill rate 4)

      10.66

      1 skilled operative (skill rate 4)

      10.16

      2 unskilled operatives (general)

      19.04

      1 plant operator (skill rate 3)— 75% of time

      9.29

      Total Gang Rate/Hour

      £ 49.15

      Cable laying gang

      1 ganger/chargehand (skill rate 4)

      10.66

      2 skilled operatives (skill rate 3)

      22.80

      1 skilled operative (skill rate 4)

      10.16

      Total Gang Rate/Hour

      £ 43.62

      RESOURCESPLANT

      Service trenching JCB 3CX backhoe-50% of time

      7.11

      125 cfm compressor-50% of time

      2.22

      scabbler-50% of time

      2 t dumper-50% of time

      1.60

      trench excavator-25% of time

      12.57

      Total Rate/Hour £ 25.11 Cable laying 8 t Leyland Road Runner chassis50% of time

      4.05

      Total Rate/Hour £ 4.05 LOCATING BURIED ROAD LIGHTING AND TRAFFIC SIGNS CABLE

      Locating buried road lighting and traffic signs cable

      in carriageways, footways, bridge decks and paved areas

      0.25 12.29 6.28 – m 18.56

      in verges and central reserves

      0.20 9.83 5.02 – m 14.85

      in side slopes of cuttings or side slopes of embankments

      0.15 7.37 3.77 – m 11.15

      TRENCH FOR CABLE OR DUCT

      Trench for cable 300 to 450 mm wide; depth not exceeding 1.5 m

      0.15 7.37 3.77 – m 11.15

      450 to 600 mm wide; depth not exceeding 1.5 m

      0.20 9.83 5.02 – m 14.85

      Extra for excavating rock or reinforced concrete in trench

      0.50 24.57 12.56 – m337.14

      Extra for excavating

      0.40 19.66 10.04 – m329.70

      Extra for backfilling with pea gravel

      0.02 0.98 0.51 12.68 m314.17

      Extra for 450×100 mm sand cable bedding and covering

      0.02 0.98 0.51 1.00 m 2.49

      Extra for PVC marker tape

      0.01 0.25 0.13 0.15 m 0.52

      Extra for 150×300 clay cable tiles

      0.05 2.46 1.26 3.76 m 7.48

      Extra for 150×900 concrete cable tiles

      0.03 1.47 0.76 6.39 m 8.63

      CABLE AND DUCT

      600/1000V 2 core, PVC/SWA/PVC cable with copper conductors

      Cable; in trench not exceeding 1.5 m deep

      2.5 mm2 0.01 0.44 0.04 2.08 m 2.55 4 mm2 0.02 0.87 0.08 2.75 m 3.70 6 mm2 0.02 0.87 0.08 3.22 m 4.17 10 mm2 0.02 0.87 0.08 4.42 m 5.37 16 mm2 0.02 0.87 0.08 5.54 m 6.49 25 mm2 0.03 1.31 0.12 7.01 m 8.44 600/1000V 4 core, PVC/SWA/PVC cable with copper conductors

      Cable; in trench not exceeding 1.5 m deep

      16 mm2 0.03 1.31 0.12 7.96 m 9.39 35 mm2 0.13 5.67 0.53 9.57 m 15.76 70 mm2 0.15 6.54 0.61 12.96 m 20.11 600/1000V 2 core, PVC/SWA/PVC

      or troughs Cable; in trench not exceeding 1.5 m deep

      2.5 mm2 0.01 0.44 0.04 1.97 m 2.45 4 mm2 0.02 0.87 0.08 2.65 m 3.60 6 mm2 0.02 0.87 0.08 3.13 m 4.08 10 mm2 0.02 0.87 0.08 4.32 m 5.27 16 mm2 0.03 1.31 0.12 5.43 m 6.86 35 mm2 0.12 5.23 0.49 6.92 m 12.64 70 mm2 0.14 6.11 0.57 10.49 m 17.16 CABLE JOINTS AND CABLE TERMINATIONS

      Straight joint in 2 core PVC/SWA/PVC cable

      2.5 mm2 0.30 13.09 1.21 39.58 nr 53.88 4.0 mm2 0.30 13.09 1.21 39.58 nr 53.88 6.0 mm2 0.32 13.96 1.30 39.58 nr 54.83 10.0 mm2 0.42 18.32 1.70 40.40 nr 60.42 16.0 mm2 0.50 21.81 2.02 42.37 nr 66.20 35.0 mm2 0.80 34.90 3.24 53.89 nr 92.03 70.0 mm2 1.15 50.16 4.66 59.64 nr 114.46 Tee joint in 2 core PVC/SWA/PVC cable

      2.5 mm2 0.46 20.07 1.86 59.07 nr 81.00 4.0 mm2 0.46 20.07 1.86 59.07 nr 81.00 6.0 mm2 0.48 20.94 1.94 59.07 nr 81.95 10.0 mm2 0.62 27.04 2.51 60.59 nr 90.14 16.0 mm2 0.74 32.28 3.00 63.25 nr 98.52 25.0 mm2 0.91 39.69 3.68 67.75 nr 111.13 Tee joint in 4 core PVC/SWA/PVC cable

      16.0 mm2 1.10 47.98 4.45 69.57 nr 122.00 35.0 mm2 1.30 56.71 5.26 77.90 nr 139.86 70.0 mm2 1.60 69.79 6.48 111.86 nr 188.13

      Looped terminations of 2 core PVC/SWA/PVC cable in lit sign units, traffic signals installation control unit, pedestrian crossing control unit, road lighting column, wall mounting, subway distribution box, gantry distribution box or feederpillar.

      T&F logoTaylor & Francis Group logo
      • Policies
        • Privacy Policy
        • Terms & Conditions
        • Cookie Policy
        • Privacy Policy
        • Terms & Conditions
        • Cookie Policy
      • Journals
        • Taylor & Francis Online
        • CogentOA
        • Taylor & Francis Online
        • CogentOA
      • Corporate
        • Taylor & Francis Group
        • Taylor & Francis Group
        • Taylor & Francis Group
        • Taylor & Francis Group
      • Help & Contact
        • Students/Researchers
        • Librarians/Institutions
        • Students/Researchers
        • Librarians/Institutions
      • Connect with us

      Connect with us

      Registered in England & Wales No. 3099067
      5 Howick Place | London | SW1P 1WG © 2022 Informa UK Limited