ABSTRACT

In-situ concrete foundations complete with associated excavation and disposal trench fill strip foundation; 450 x 1000 mm deep m 76 trench fill strip foundation; 600 x 1200 mm deep m 108 strip foundation; 900 mm deep m 112 strip foundation; 1200 mm deep m 136 column/stanchion base; unreinforced; 900 x 900 x 450 mm nr 126 column/stanchion base; reinforced 50 kg/m³; 1750 x 1750 x 500 mm nr 367 column/stanchion base; reinforced 50 kg/m³; 2200 x 2200 x 600 mm nr 688 column/stanchion base; reinforced 75 kg/m³; 2400 x 2400 x 600 mm nr 825 pile cap; reinforced 75 kg/m³; 900 x 900 x 1400 mm; for one pile nr 366 pile cap; reinforced 75 kg/m³; 2700 x 900 x 1400 mm; for two piles nr 917 pile cap; reinforced 75 kg/m³; 2700 x 2700 x 1400 mm; for four piles nr 2121 pile cap; reinforced 75 kg/m³; 3700 x 2700 x 1400 mm; for six piles nr 2867

In-situ concrete slabs comprising concrete C30 slab with tamped finish; reinforced with two layers of A393 fabric; laid in bays size 20 m x 10m on sub-base of 250 mm granular material; including all associated excavation (250 mm depth), formwork and formed expansion joints with filler

200 mm thick m² 30.60 250 mm thick m² 36.30 275 mm thick m² 39.10 300 mm thick m² 42.00 Extra over cost of slab for hand trowel finish m² 0.97 for power float finish m² 2.55 for wire brush finish m² 2.00 for additional sub base depth (including excavation and disposal)

50 mm m² 1.53 100 mm m² 3.08 150 mm m² 4.61