ABSTRACT

NOTES Refer also to the example calculation of Preliminaries in Part 2 and also to Part 8 Oncosts and Profit. CONTRACTUAL REQUIREMENTS Performance bond The cost of the bond will relate to the nature and degree of difficulty and risk inherent in the type of works intended, the perceived ability and determination of the Contractor to complete them, his financial status and whether he has a proven track record in this field with the provider. Refer to the discussion of the matter on page 22. Insurance of the Works Refer to the discussion of the various insurances on pages 21 and 22 as well as the example on page 27. Third party insurance Refer to the discussion of the various insurances on pages 21 and 22 as well as the example on page 27. SPECIFIED REQUIREMENTS General This section entails the listing of services and facilities over and above the 'Permanent Works' which the Contractor would be instructed to provide in the Contract Documents. Accommodation for the Engineer's Staff Refer to Resources - Plant page 145 and 146 for a list of accommodation types. Services for the Engineer's staff Transport vehicles 4 WD utility short wheelbase - - 500.20 - week 500.20 4 WD long wheelbase - - 599.80 - week 599.80 (for other vehicles, refer to Resources - Plant page 138) Telephones (allow for connection charges and usage of telephones required for use by the Engineer's Staff) Equipment for use by the Engineer's staff Allow for equipment specifically required; entailing Office Equipment, Laboratory Equipment and Surveying Equipment.