ABSTRACT
The specification of effective and robust construc-
tion schedules is a very complex and challenging
task. A multitude of different requirements such
as technological dependencies, safety aspects and
material availability has to be considered to deter-
mine efficient schedules regarding the project
objectives time and costs. A third scheduling
objective is the quality of the product, which is not
considered sufficiently, in today’s scheduling prac-
tice. Currently, quality aspects are only influenced
by the selection of material or the determination
of certain inspection dates.