ABSTRACT

The example is of a contract for the construction of an Airport extension. The contract includes concrete surfaced aprons/runways, surface water drainage, construction of two concrete structures, minor accommodation works and two culverts. The Conditions of contract are ICE Standard conditions; the contract period is 12 months; and the approximate value is £11 million.