ABSTRACT

A12/210 – Congestion charging London only – – – – – week 40.00

A12/250 – Site visit; pre-tender for purposes of understanding site and tender requirements; prices below are based on a single senior manager attending site City location; average distance of travel 20miles inclusive of travel and parking costs

less than 500m2 – 4.00 140.00 – 36.00 nr 176.00 up to 1000m2 – 5.00 175.00 – 38.00 nr 213.00 up to 2000m2 – 6.00 210.00 – 44.00 nr 254.00 up to 4000m2 – 8.00 280.00 – 52.00 nr 332.00

Town or rural location; average distance of travel 20miles inclusive of travel and parking costs

less than 500m2 – 3.00 105.00 – 22.00 nr 127.00 up to 1000m2 – 4.00 140.00 – 23.00 nr 163.00 up to 2000m2 – 5.00 175.00 – 24.00 nr 199.00 up to 4000m2 – 6.00 210.00 – 24.00 nr 234.00

A20 THE CONTRACT/SUBCONTRACT

Contract/subcontract evaluation Due diligence on evaluation or examination of clauses in contract documents; evaluation and report by a suitably qualified quantity surveyor or legal advisor where necessary

minor works contract – 1.00 35.00 – – nr 35.00 JCLI – – – – 70.00 nr 70.00 JCT intermediate contract or subcontract – 1.00 35.00 – 140.00 nr 175.00

A30 EMPLOYER’S REQUIREMENTS: TENDERING/SUBLETTING/SUPPLY

A30/480 – Programmes; tender stage programmes Allow for production of an outline works programmes for submission with the tenders; project value

£30,000 – 1.50 52.50 – – nr 52.50 £50,000 – 2.00 70.00 – – nr 70.00 £75,000 – 2.50 87.50 – – nr 87.50 £100,000 – 3.00 105.00 – – nr 105.00 £200,000 – 4.00 140.00 – – nr 140.00 £500,000 – 4.50 157.50 – – nr 157.50 £1,000,000 – 6.00 210.00 – – nr 210.00

Method statements for private or commercial projects where award is not points based; provide detailed method statements on all aspects of the works; project value

£30,000 – 2.50 87.50 – – nr 87.50 £50,000 – 3.50 122.50 – – nr 122.50 £75,000 – 4.00 140.00 – – nr 140.00 £100,000 – 5.00 175.00 – – nr 175.00 £200,000 – 6.00 210.00 – – nr 210.00 £500,000 – 7.00 245.00 – – nr 245.00 £1,000,000 – 8.00 280.00 – – nr 280.00

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

A30 EMPLOYER’S REQUIREMENTS: TENDERING/SUBLETTING/SUPPLY – cont

A30/500 – Method statements for local authority type projects where award is points rated; provide detailed method statements on all aspects of the works; project value

£30,000 – 5.00 175.00 – – nr 175.00 £50,000 – 5.00 175.00 – – nr 175.00 £75,000 – 6.00 210.00 – – nr 210.00 £100,000 – 7.00 245.00 – – nr 245.00 £200,000 – 8.00 280.00 – – nr 280.00 £500,000 – 9.00 315.00 – – nr 315.00 £1,000,000 – 16.00 560.00 – – nr 560.00

A30/550-570 – Health and safety Produce health and safety file including preliminary meeting and subsequent progress meetings with external planning officer in connection with health and safety; project value

£35,000 – 8.00 280.00 – – nr 280.00 £75,000 – 12.00 420.00 – – nr 420.00 £100,000 – 16.00 560.00 – – nr 560.00 £200,000 to £500,000 – 40.00 1400.00 – – nr 1400.00

Maintain health and safety file for project duration; project value

£35,000 – 4.00 140.00 – – week 140.00 £75,000 – 4.00 140.00 – – week 140.00 £100,000 – 8.00 280.00 – – week 280.00 £200,000 to £500,000 – 8.00 280.00 – – week 280.00

Produce written risk assessments on all areas of operations within the scope of works of the contract; project value

£35,000 – 2.00 70.00 – – nr 70.00 £75,000 – 3.00 105.00 – – nr 105.00 £100,000 – 5.00 175.00 – – nr 175.00 £200,000 to £500,000 – 8.00 280.00 – – nr 280.00

Produce COSHH assessments on all substances to be used in connection with the contract; project value

£35,000 – 1.50 52.50 – – nr 52.50 £75,000 – 2.00 70.00 – – nr 70.00 £100,000 – 3.00 105.00 – – nr 105.00 £200,000 to £500,000 – 3.00 105.00 – – nr 105.00

A31 EMPLOYER’S REQUIREMENTS: PROVISION, CONTENT AND USE OF DOCUMENTS

Provision, content and use of documents Supply as built drawings for elements of the project that may have varied from the original design drawings

£35,000 – 2.00 70.00 – – nr 70.00 £75,000 – 2.00 70.00 – – nr 70.00 £100,000 – 4.00 140.00 – – nr 140.00 £200,000 to £500,000 – 5.00 175.00 – – nr 175.00

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

A31/155 – Fees for Considerate Contractors Scheme (CCS) Project value

up to £100,000 – – – – 100.00 nr 100.00 £100,000-£500000 – – – – 200.00 nr 200.00 £500,000-£5,000,000 – – – – 400.00 nr 400.00 over £5,000,000 – – – – 600.00 nr 600.00

Climatic conditions – keep records of temperature and rainfall; delays due to weather including descriptions of weather

daily cost – 0.08 2.92 – – day 2.92 weekly cost – 0.42 14.58 – – day 14.58

A31/211 – Programmes; master programme for the contract works Allow for production of works programmes prior to the start of the works; project value

£30,000 – 3.00 105.00 – – nr 105.00 £50,000 – 6.00 210.00 – – nr 210.00 £75,000 – 8.00 280.00 – – nr 280.00 £100,000 – 10.00 350.00 – – nr 350.00 £200,000 – 14.00 490.00 – – nr 490.00 £500,000 – 15.00 525.00 – – nr 525.00 £1,000,000 – 18.00 630.00 – – nr 630.00

A31/212 – Indicative staff resource chart Project value

up to £100000 – 1.00 35.00 – – nr 35.00 up to £500000 – 1.50 52.50 – – nr 52.50 up to £1,000,000 – 2.00 70.00 – – nr 70.00

A31/213 – Curriculum vitae of staff Prepare and submit curriculum vitae of pre-construction and construction phase staff

per staff member – 0.75 26.25 – – nr 26.25

A33 SUBMISSION OF SAMPLES

Set up sample panels for the works inclusive of arranging delivery of sample materials; paving samples on 100mm base Costs of labours only

brick paving panel (pointed) – 6.00 111.00 – – m2 111.00 brick paving panel (butt jointed) – 4.00 74.00 – – m2 74.00 block paving panel – 4.00 74.00 – – m2 74.00 stone slab paving panel – 6.00 111.00 – – m2 111.00 cladding panel – 7.00 129.50 – – m2 129.50 brick wall panel – 5.00 92.50 – – m2 92.50 render panel – 3.50 64.75 – – m2 64.75 paint panel – 3.00 55.50 – – m2 55.50

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

F10 PIERS

Isolated brick piers in English bond Engineering brick PC £239.00/1000 (not SMM)

one brick thick (225mm) – 1.63 30.23 – 8.63 m 38.86 one and a half bricks thick (337.5mm) – 3.00 55.50 – 25.57 m 81.07 two bricks thick (450mm) – 4.50 83.25 – 40.87 m 124.12

Brick PC £300.00/1000 (not SMM) one brick thick (225mm) – 1.63 30.23 – 10.43 m 40.66 one and a half bricks thick (337.5mm) – 3.00 55.50 – 29.46 m 84.96 two bricks thick (450mm) – 4.50 83.25 – 47.79 m 131.04 three bricks thick (675mm) – 8.37 154.84 – 99.08 m 253.92

Brick PC £800.00/1000 (not SMM) one brick thick (225mm) – 1.63 30.23 – 25.13 m 55.36 one and a half bricks thick (337.5mm) – 3.00 55.50 – 61.36 m 116.86 two bricks thick (450mm) – 4.50 83.25 – 104.49 m 187.74 three bricks thick (675mm) – 8.37 154.84 – 226.65 m 381.49

Q31 PLATIPUS TREE ANCHORS

Platipus anchors; anchoring kits for semi-mature trees Deadman kits; anchoring to concrete kerbs placed in base of tree pit

trees 12-25 cm girth; 2.5-4.0m high 26.62 0.75 13.88 – 41.24 nr 55.12 trees 25-45 cm girth; 4.0-7.5m high 45.82 1.50 27.75 – 60.44 nr 88.19 trees 45-75 cm girth; 7.5-12.0m high 150.86 2.00 37.00 – 165.48 nr 202.48

Q31 PLATIPUS TREE WATERING SYSTEMS

Tree irrigation kits; direct water delivery to the rootball area of trees Piddler tree irrigation system; permeable membrane delivering targeted irrigation to rootball surround

root balls up to 550mm diameter; Irrigation Kit PID0 7.00 0.25 4.63 – 7.00 nr 11.63 root balls up to 900mm diameter; Irrigation Kit PID1 12.50 0.30 5.55 – 12.50 nr 18.05 root balls up to 1.55m diameter; Irrigation Kit PID2 16.50 0.40 7.40 – 16.50 nr 23.90 root balls up to 2.40m diameter; Irrigation Kit PID3 20.50 0.45 8.32 – 20.50 nr 28.82 root balls up to 3.10m diameter; Irrigation Kit PID4 25.50 0.50 9.25 – 25.50 nr 34.75

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

Q31 LORENZ VON EHREN – PLEACHED/ PRUNED TREES

Pleached trees; Carpinus betulus; specimen trees; Lorenz Von Ehren; supply and planting only; excavation, support and treepit additives not included Box shaped trees to provide ‘floating hedge’ or screen effect; planting distance 1 tree per m run; trunk and box alignment; wire root balls

4 × transplanted; 20-25 cm; 1.00m centres 300.00 5.00 92.50 16.62 300.00 m 409.12 5 × transplanted; 25-30 cm; 1.00m centres 430.00 6.50 120.25 20.68 430.00 m 570.93 5 × transplanted; 30-35 cm; 1.20m centres 720.00 11.00 203.50 27.68 720.00 m 951.18

Pleached trees; Tilia europaea ‘Pallida’; specimen trees; Lorenz Von Ehren; supply and planting only; excavation, support and treepit additives not included Box pleached trees to provide ‘floating hedge’ or screen effect; wire root balls

4 × transplanted; 20-25 cm; 1.00m centres 300.00 5.00 92.50 16.62 300.00 m 409.12 4 × transplanted; 25-30 cm; 1.00m centres 370.00 5.00 92.50 16.62 370.00 m 479.12 5 × transplanted; 30-35 cm; 1.20m centres 358.32 5.00 92.50 16.62 358.32 m 467.44 5 × transplanted; 35-40 cm; 1.50m centres 380.02 5.00 92.50 16.62 380.02 m 489.14 6 × transplanted; 40-45 cm; 1.80m centres 444.48 5.00 92.50 16.62 444.48 m 553.60 6 × transplanted; 45-50 cm; 1.80m centres 550.04 5.00 92.50 16.62 550.04 m 659.16 6 × transplanted; 50-60 cm; 2.00m centres 700.00 5.00 92.50 16.62 700.00 m 809.12

Espalier pleached trees; specimen trees; Lorenz Von Ehren; supply and planting only; excavation, support and treepit additives not included Frame pleached trees; to provide floating screen effects; wire root balls

Carpinus betulus; 20-25cm; 1.00m centres 420.00 5.00 92.50 16.62 420.00 m 529.12 Carpinus betulus; 25-30cm; 1.00m centres 550.00 5.00 92.50 16.62 550.00 m 659.12 Tilia europaea ‘Pallida’; 20-25 cm; 1.00m centres 420.00 5.00 92.50 16.62 420.00 m 529.12 Tilia europaea ‘Pallida’; 25-30 cm; 1.00m centres 550.00 5.00 92.50 16.62 550.00 m 659.12 Tilia europaea ‘Pallida’; 30-35 cm; 1.20m centres 658.31 5.00 92.50 16.62 658.31 m 767.43

Umbrella shaped pleaches Umbrella or roof pleached trees to provide umbrella effect; wire root balls

Tilia euchlora; specimen; 4 × transplanted; 20-25 cm 390.00 5.00 92.50 16.62 390.00 ea 499.12 Tilia euchlora; specimen; 5 × transplanted; 25-30 cm 480.00 5.00 92.50 16.62 480.00 ea 589.12 Platanus acerifolia; clear stem; 4 × transplanted; 20-25 cm 390.00 5.00 92.50 16.62 390.00 ea 499.12 Platanus acerifolia; specimen; 5 × transplanted; 30-35 cm 700.00 5.00 92.50 16.62 700.00 ea 809.12 Tilia europaea; specimen; 5 × transplanted; 30-35 cm 700.00 5.00 92.50 16.62 700.00 ea 809.12 Platanus acerifolia; specimen; 5 × transplanted; 25-30 cm 480.00 5.00 92.50 16.62 480.00 ea 589.12

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

Q31 GREEN SCREEN; MOBILANE LTD

Green Screen; Mobilane Ltd Fully installed vertical green screen of Hedera hibernica; 65 plants per linear m; all on 5mm galvanized steel weldmesh; attached to existing wall fence or hoarding

screen 1.80 high – – – – 170.00 m 170.00 screen 2.20m high – – – – 230.00 m 230.00 screen 4.00m high – – – – 500.00 m 500.00

Living wall; Mobilane Ltd LivePanel; fully installed living wall adjusted to fit modules with developed substrate; panels are stacked onto building or wall face of the building and secured by an aluminium frame – – – – 600.00 m2 600.00

Q50 STREET FURNITURE

Anti-skateboard devices Stainless steel; Furnitubes International Ltd

for fitting to seats 18.00 0.20 3.70 – 18.00 ea 21.70 for fitting to benches 36.00 0.20 3.70 – 36.00 ea 39.70

Bollards Recycled plastic bollards; Furnitubes International Ltd

Aberdeen Circular ABR150; 1000 × 150mm diameter 56.00 2.00 37.00 – 61.21 ea 98.21 Aberdeen Square ABR140; 1000 × 140 × 140mm 35.00 2.00 37.00 – 40.21 ea 77.21

Service bollards; Furnitubes International Ltd; stainless steel; for housing services connection points to electricity, water etc. (services connections not included)

Kenton KEN717; 900 × 250mm diameter 595.00 2.00 37.00 – 600.21 ea 637.21 Zenith ZEN707; 900 × 250mm diameter 550.00 2.00 37.00 – 555.21 ea 592.21

Cigarette bins Furnitubes International Ltd

ZEN 275 Zenith cigarette bin; stainless steel; wall or post mounted; 1.7 L 29.99 0.75 13.88 – 35.71 ea 49.59 LVR250 PC Liverpool cigarette bin; steel; wall mounted; 1.9 L 16.75 0.50 9.25 – 16.75 ea 26.00 SMK500F Smoke King cigarette bin; cast aluminium; bolt down; 3.5 L 199.99 0.75 13.88 – 205.71 ea 219.59

Outdoor seats; recycled plastic Furnitubes International Ltd

Aberdeen seat, brown recycled plastic; 1 slat; 2m long 296.00 2.00 37.00 – 315.57 ea 352.57 Aberdeen seat, brown recycled plastic; 2 slats; 2m long 401.00 2.00 37.00 – 420.57 ea 457.57

Picnic table; recycled plastic Furnitubes International Ltd

Dundee picnic table; brown recycled plastic; 1.8m long 643.00 2.00 37.00 – 662.57 ea 699.57

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

Cycle shelters Furnitubes International Ltd; Academy freestanding bolt down shelter, galvanized steel frame and roof; 3450mm overall width; 2150mm maximum height; 2670mm depth

corrugated roof 1873.00 6.00 111.00 – 1884.45 ea 1995.45 clear polycarbonate roof 2024.00 6.00 111.00 – 2035.45 ea 2146.45

Smoking shelters Furnitubes International Ltd; Ashby freestanding bolt down; aluminium frame; PET glazing; 2050mm length × 2330mm high

3290mm depth; maximum 3 people 2067.00 4.00 74.00 – 2078.45 ea 2152.45 6050mm depth; maximum 6 people 2597.00 5.00 92.50 – 2608.45 ea 2700.95

Monolith signage boards Furnitubes International Ltd; Fulham monolith signage board; stainless steel frame; vinyl graphics; 2600mm above ground; 600mm below ground; 350mm width × 120mm depth

without baseplate 3550.00 2.00 37.00 – 3554.83 ea 3591.83 with baseplate 3700.00 2.00 37.00 – 3704.83 ea 3741.83

V ELECTRICAL – ELECTRICAL CABLES

Cable to trenches (trenching operations not included); laying only cable Twin core steel wire armoured cable; 50m drums

1.5mm core 0.80 – – – 0.80 m 0.80 2.5mm core 0.96 – – – 0.96 m 0.96

Twin core steel wire armoured cable; lengths less than 50m runs

1.5mm core 0.86 – – – 0.86 m 0.86 2.5mm core 1.04 – – – 1.04 m 1.04

Three core steel wire armoured cable; 50m drums

1.5mm core 0.90 – – – 0.90 m 0.90 2.5mm core 1.23 – – – 1.23 m 1.23 4.0mm core 1.48 – – – 1.48 m 1.48 6.0mm core 1.92 – – – 1.92 m 1.92 10.0mm core 3.39 – – – 3.39 m 3.39

Three core steel wire armoured cable; lengths less than 50m runs

1.5mm core 0.93 – – – 0.93 m 0.93 2.5mm core 1.33 – – – 1.33 m 1.33

Ducts to trenches; twin wall flexible cable ducts with drawstrings; laid on 150mm clean sharp sand Twin wall duct; laying to trenches

63mm × 50m coils 1.00 0.02 0.37 – 1.00 m 1.37 110mm × 50m coils 1.50 0.02 0.37 – 1.50 m 1.87

Cable drawing through ducts straight runs up to 50m lengths – 1.00 18.50 – – nr 18.50

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

V ELECTRICAL – ELECTRICAL CABLES – cont

Terminations to armoured cables; cutting coiling and taping length of cable to receive connection to light fitting, transformer and the like; fixing to temporary post Armoured cable – 0.33 6.16 – – m 6.16 Plain ducted cable – 0.13 2.31 – – m 2.31

Junction boxes; fixing to cables to receive connections to light fittings or transformers; to IP68 Underground jointing box

2 way 29.00 0.33 6.83 – 29.00 m 35.83 3 way 34.00 0.57 11.71 – 34.00 m 45.71

Underground jointing box 2 way 3.50 0.33 6.83 – 3.50 m 10.33 3 way 4.90 0.40 8.20 – 4.90 m 13.10

Electrical connections Connections to existing distribution boards

per switching circuit located within 1m of the distribution board; chasing of cables to walls not included – – – – – nr 41.67

Connections to switches; external power cable circuits; connections to internal wall switches; drilling through walls and making good; chasing of cables to walls not included

price for the first circuit 4.00 1.00 18.50 – 45.67 nr 64.17 additional circuits 4.00 – – – 14.00 nr 14.00

V ELECTRICAL – TRENCHING FOR ELECTRICAL SERVICES

Trenching for electrical services 3 tonne excavator (bucket volume 0.13m3); arisings laid alongside

600mm deep – – – 1.84 – m 1.84 800mm deep – – – 2.15 – m 2.15 1.00m deep – – – 2.57 – m 2.57

Extra over any types of excavating irrespective of depth for breaking out existing materials; heavy duty 110 volt breaker tool

hard rock – 5.00 92.50 19.10 – m3 111.60 concrete – 3.00 55.50 11.46 – m3 66.96 reinforced concrete – 4.00 74.00 19.50 – m3 93.50 brickwork, blockwork or stonework – 1.50 27.75 5.73 – m3 33.48

By hand 600mm deep – 0.24 4.45 – – m 4.45 800mm deep – 0.43 7.91 – – m 7.91 1.00m deep – 0.67 12.33 – – m 12.33

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

Backfilling of trenches; including laying of electrical marker tape; compacting lightly as work proceeds To trenches containing armoured cable

by machine 0.13 – – 2.28 0.13 m 2.41 by hand 0.13 0.20 3.70 – 0.13 m 3.83

To trenches containing ducted cable; including 150mm sharp sand over the duct

by machine 1.97 – – 2.85 1.97 m 4.82 by hand 1.97 0.25 4.63 – 1.97 m 6.60

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

A11 TENDER AND CONTRACT DOCUMENTS

Method statements Provide detailed method statements on all aspects of the works; project value

£30,000 – 2.50 87.50 – – nr 87.50 £50,000 – 3.50 122.50 – – nr 122.50 £75,000 – 4.00 140.00 – – nr 140.00 £100,000 – 5.00 175.00 – – nr 175.00 £200,000 – 6.00 210.00 – – nr 210.00

Tender and contract documents Drawing and plan printing and distribution costs; plans issued by employer on CD; project value

£30,000 – – – – 19.00 nr 19.00 £30,000 to £80,000 – – – – 47.50 nr 47.50 £80,000 to £150,000 – – – – 95.00 nr 95.00 £150,000 to £300,000 – – – – 133.00 nr 133.00 £300,000 to £1,000,000 – – – – 228.00 nr 228.00

Contract drawings for project management and distribution to suppliers, subcontractors and site staff

£30,000 – – – – 38.00 nr 38.00 £30,000 to £80,000 – – – – 95.00 nr 95.00 £80,000 to £150,000 – – – – 190.00 nr 190.00 £150,000 to £300,000 – – – – 266.00 nr 266.00 £300,000 to £1,000,000 – – – – 456.00 nr 456.00

A12 THE SITE/EXISTING BUILDINGS

A12/140 – Existing mains and services; mark positions of existing mains and services; locate and mark; site area

less than 500m2 – 1.50 27.75 – – nr 27.75 up to 1000m2 – 3.00 55.50 – – nr 55.50 up to 2000m2 – 8.00 148.00 – – nr 148.00 up to 4000m2 – 16.00 296.00 – – nr 296.00

A12/200 – Access to the site For pedestrians

security kiosk – – – 65.00 – week 65.00 security guard – 40.00 400.00 – – week 400.00 protected walkways; Heras fencing on 2 sides – – – 4.21 – m 4.21

A12/210 – Parking Parking expenses where vehicles do not park on the site area; per vehicle

metropolitan area; city centre – – – – – week 200.00 metropolitan area; outer areas – – – – – week 160.00 suburban restricted parking areas – – – – – week 40.00

A12/210 – Congestion charging London only – – – – – week 40.00

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

A12/250 – Site visit; pre-tender for purposes of understanding site and tender requirements; prices below are based on a single senior manager attending site City location; average distance of travel 20miles inclusive of travel and parking costs

less than 500m2 – 4.00 140.00 – 36.00 nr 176.00 up to 1000m2 – 5.00 175.00 – 38.00 nr 213.00 up to 2000m2 – 6.00 210.00 – 44.00 nr 254.00 up to 4000m2 – 8.00 280.00 – 52.00 nr 332.00

Town or rural location; average distance of travel 20miles inclusive of travel and parking costs

less than 500m2 – 3.00 105.00 – 22.00 nr 127.00 up to 1000m2 – 4.00 140.00 – 23.00 nr 163.00 up to 2000m2 – 5.00 175.00 – 24.00 nr 199.00 up to 4000m2 – 6.00 210.00 – 24.00 nr 234.00

A20 THE CONTRACT/SUBCONTRACT

Contract/subcontract evaluation Due diligence on evaluation or examination of clauses in contract documents; evaluation and report by a suitably qualified quantity surveyor or legal advisor where necessary

minor works contract – 1.00 35.00 – – nr 35.00 JCLI – – – – 70.00 nr 70.00 JCT intermediate contract or subcontract – 1.00 35.00 – 140.00 nr 175.00

A30 EMPLOYER’S REQUIREMENTS: TENDERING/SUBLETTING/SUPPLY

Tendering costs for an employed estimator for the acquisition of a landscape main or subcontract; inclusive of measurement, sourcing of materials and suppliers, cost and area calculations, pre-and post-tender meetings, bid compliance method statements and submission documents Remeasureable contract from prepared bills; contract value

£25,000 – – – – – nr 180.00 £50,000 – – – – – nr 300.00 £100,000 – – – – – nr 720.00 £200,000 – – – – – nr 1200.00 £500,000 – – – – – nr 1560.00 £1,000,000 – – – – – nr 2400.00

Lump sum contract from specifications and drawings only; contract value

£25,000 – – – – – nr 480.00 £50,000 – – – – – nr 600.00 £100,000 – – – – – nr 1200.00 £200,000 – – – – – nr 2160.00 £500,000 – – – – – nr 3000.00 £1,000,000 – – – – – nr 4800.00

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

A30 EMPLOYER’S REQUIREMENTS: TENDERING/SUBLETTING/SUPPLY – cont

Material costs for tendering Drawing and plan printing and distribution costs; plans issued by employer on CD; project value

£30,000 – – – – 19.00 nr 19.00 £30,000 to £80,000 – – – – 47.50 nr 47.50 £80,000 to £150,000 – – – – 95.00 nr 95.00 £150,000 to £300,000 – – – – 133.00 nr 133.00 £300,000 to £1,000,000 – – – – 228.00 nr 228.00

A31 EMPLOYER’S REQUIREMENTS: PROVISION, CONTENT AND USE OF DOCUMENTS

Provision, content and use of documents Supply as built drawings for elements of the project that may have varied from the original design drawings

£35,000 – 2.00 70.00 – – nr 70.00 £75,000 – 2.00 70.00 – – nr 70.00 £100,000 – 4.00 140.00 – – nr 140.00 £200,000 to £500,000 – 5.00 175.00 – – nr 175.00

A31/155 – Fees for Considerate Contractors Scheme (CCS) Project value

up to £100,000 – – – – 100.00 nr 100.00 £100,000-£500000 – – – – 200.00 nr 200.00 £500,000-£5,000,000 – – – – 400.00 nr 400.00 over £5,000,000 – – – – 600.00 nr 600.00

Climatic conditions – keep records of temperature and rainfall; delays due to weather including descriptions of weather

daily cost – 0.08 2.92 – – day 2.92 weekly cost – 0.42 14.58 – – day 14.58

A31/211 – Programmes; master programme for the contract works Allow for production of works programmes prior to the start of the works; project value

£30,000 – 3.00 105.00 – – nr 105.00 £50,000 – 6.00 210.00 – – nr 210.00 £75,000 – 8.00 280.00 – – nr 280.00 £100,000 – 10.00 350.00 – – nr 350.00 £200,000 – 14.00 490.00 – – nr 490.00 £500,000 – 15.00 525.00 – – nr 525.00 £1,000,000 – 18.00 630.00 – – nr 630.00

A31/212 – Indicative staff resource chart Project value

up to £100,000 – 1.00 35.00 – – nr 35.00 up to £500,000 – 1.50 52.50 – – nr 52.50 up to £1,000,000 – 2.00 70.00 – – nr 70.00

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

A31/213 – Curriculum vitae of staff Prepare and submit curriculum vitae of pre-construction and construction phase staff

per staff member – 0.75 26.25 – – nr 26.25

A32 EMPLOYER’S REQUIREMENTS: MANAGEMENT OF THE WORKS

Allow for updating the works programme during the course of the works; project value

£30,000 – 1.00 35.00 – – nr 35.00 £50,000 – 1.50 52.50 – – nr 52.50 £75,000 – 2.00 70.00 – – nr 70.00 £100,000 – 3.00 105.00 – – nr 105.00 £200,000 – 5.00 175.00 – – nr 175.00

Setting out Setting out for external works operations comprising hard and soft works elements; placing of pegs and string lines to Landscape Architect’s drawings; surveying levels and placing level pegs; obtaining approval from the Landscape Architect to commence works; areas of entire site

1,000m2 – 5.00 92.50 – 6.20 nr 98.70 2,500m2 – 8.00 148.00 – 12.40 nr 160.40 5,000m2 – 8.00 148.00 – 12.40 nr 160.40 10,000m2 – 32.00 592.00 – 31.00 nr 623.00

A33 SUBMISSION OF SAMPLES

Set up sample panels for the works inclusive of arranging delivery of sample materials; paving samples on 100mm base Costs of labours only

brick paving panel (pointed) – 6.00 111.00 – – m2 111.00 brick paving panel (butt jointed) – 4.00 74.00 – – m2 74.00 block paving panel – 4.00 74.00 – – m2 74.00 stone slab paving panel – 6.00 111.00 – – m2 111.00 cladding panel – 7.00 129.50 – – m2 129.50 brick wall panel – 5.00 92.50 – – m2 92.50 render panel – 3.50 64.75 – – m2 64.75 paint panel – 3.00 55.50 – – m2 55.50

A34 EMPLOYER’S REQUIREMENTS: SECURITY/SAFETY/PROTECTION

Temporary security fence; HSS Hire; mesh framed unclimbable fencing; including precast concrete supports and couplings Weekly hire; 2.85 × 2.00m high

weekly hire rate – – – 2.11 – m 2.11 erection of fencing; labour only – 0.10 1.85 – – m 1.85 removal of fencing loading to collection vehicle – 0.07 1.23 – – m 1.23 delivery charge – – – 0.80 – m 0.80 return haulage charge – – – 0.60 – m 0.60

Labour Material Excluding site overheads and profit £ hours £ £ £ rate £

A41 CONTRACTOR’S GENERAL COST ITEMS: SITE ACCOMODATION

General The following items are instances of the commonly found preliminary costs associated with external works contracts. The assumption is made that the external works contractor is subcontracted to a main contractor.