ABSTRACT
The Great Wall in China, a huge engineering project 2000 years ago, was developed for defense. The schedule of its design and construction was driven by the timing of the offense from another side of the wall. Engineers tried every means to integrate local defense systems into a successful military construction before another army launched their offense.